7
8
PACKAGE CONTENTS
PART
DESCRIPTION
QUANTITY
A
B
C
E
F
G
D
H
I
J
K
A Lid 1
B Table 1
C Door 1
D Lefe panel 1
E Side panel 2
F Leg with magnet right 1
G Leg with magnet left 1
H Leg 2
I Bottom 1
J Cover 1
K Lavarock 1pack
1 #2 Philips Head Screwdriver
(Not Included) 1pc
Hardware
PREPARATION
Tools Required
--Select an area where you will assemble this product. To protect components,
choose a smooth non abrasive surface that's free of cracks or openings.
--Spread out all parts.
--Tighten all hardware connections by hand first. Before completing each step,
go back and fully tighten all hardware. Be careful not to over- tighten, that could
damage surface or strip threads.
--For best results, complete each in the order presented.
To complete assembly you will need:
(1) Leak detection solution instruction on how to make the solution are included in the
“operating instructions” section of this manual).
(2) Precision-filled LP gas grill tank with Acme Type 1 external threaded valve connection
standard grill size .
Estimated Assembly Time : 30 minutes
s
c
p
0
2
M6X12 screw
AA
s
c
p
4
24 pcs
M6X25 screw
BB
CC M6 washer