background image

5

OPERATION

Before using heater, make sure heater has been properly

installed according to all installation steps.

Содержание 9905-RO2

Страница 1: ...th all applicable codes and standards including fire rated construction codes and standards 4 When cutting or drilling into wall or ceiling do not damage electrical wiring and other hidden utilities 5...

Страница 2: ...and install approved box connector s MOUNTING THE HOUSING 1 Locate housing between joists 2 Refer to Figure 5 Using nails secure hanger bars to joists NOTE The hanger bar brackets are adjustable Allow...

Страница 3: ...gure 6 All wiring must comply with local codes and unit must be properly grounded 1 Using 12 gauge wire run 120vAC 60 Hz wiring with ground from a power source to the wall switch location The unit mus...

Страница 4: ...the installation MOUNT THE HOUSING 1 The housing must be mounted between ceiling joists 2 Refer to Figure 8 Mark ceiling for cutout Cutout dimensions 141 8 long x 97 8 wide Make cutout in ceiling 3 Fo...

Страница 5: ...5 OPERATION Before using heater make sure heater has been properly installed according to all installation steps...

Страница 6: ...S l l o r c S t a e H 9 7 5 1 6 3 0 0 0 3 8 5 6 6 S t a e H l e e h W r e w o l B 3 8 5 6 6 4 5 0969B Heater Element Includes Thermal Protector S0969B 000 e l b a l i a v A t o N t e k c a r B r o t...

Страница 7: ...7 SERVICE PARTS MODEL 9905 RO2...

Страница 8: ...The duration of any implied warranty is limited to the one year period as specified for the express warranty Some states do not allow limitation on how long an implied warranty lasts so the above lim...

Отзывы: