nuhoom MANDO 345044 Скачать руководство пользователя страница 2

CODING

345044

MANDO

ASSEMBLY GUIDE

 / 4

2

STEP 6

STEP 4

STEP 2

STEP 5

STEP 3

STEP 1

1

3

4

5

6

11

12

3

4

5

5

3

4

5

6

1

3

4

5

6

- Insert hardware A1 onto panel (3), (4) and (5).
  (Repeat 6 times.)
- Insert hardware A2 onto panel (1).
  (Repeat 6 times.)
- Insert hardware onto panel (3), (4) and (5).
  (Repeat 12 times.)

SCREWDRIVER

REQUIRED

* Ensure the arrows on hardware A1 point towards mounting positions.

A2

x6

ROTATE

PRESS

A1

x6

x12

PRESS

B

- Insert hardware A1 onto panel (12).
  (Repeat 4 times.)
- Insert hardware A2 onto panel (10) and (11).
  (Repeat 4 times.)
- Insert hardware onto panel (6), (10) and (11).
  (Repeat 20 times.)

SCREWDRIVER

REQUIRED

* Ensure the arrows on hardware A1 point towards mounting positions.

10

x20

PRESS

B

6

6

6

A2

x4

ROTATE

12

PRESS

A1

x4

Fix hardware K1 (L/R) into panel (3), (4) and (5) with hardware E.

(Repeat 3 times for each hardware.)

SCREWDRIVER

REQUIRED

x3

ROTATE

x3

x3

ROTATE

ROTATE

K1(L)

E

E

E

Third hole from the edge.

First hole from the edge. Small hole at the center.

K1(R)

K1(L)

Fix hardware K1 (R) into panel (5) with hardware E.

(Repeat 2 times for each hardware.)

SCREWDRIVER

REQUIRED

K1(R)

Third hole from the edge.

First hole from the edge.

x1

x1

ROTATE

ROTATE

E

E

Attach panel (6) to panel (3), (4) and (5) .

(Repeat 4 times.)

* In this step hardware B are pre-inserted.

6

6

6

- Attach panel (1) to panel (3), (4) and (5).
- Insert all hardware A2 into A1.
- Rotate all A1 until tight.
- Apply A3 onto all A1.
  (Repeat 6 times.)

OR

HARDWARE

D

SCREWDRIVER

REQUIRED

* In this step hardware A1A2 and B are pre-inserted.

ROTATE

Section View

x6

A1

A2

x6

PRESS

A3

6

6

6

Содержание MANDO 345044

Страница 1: ...E PANEL R 7 8 QTY 3 5 BONE PANEL HARDWARE A B C D E F G 10 SETS ALLEN KEY M4 1 PC BOTTOM PANEL DRAWER FRONT CENTER PANEL H I J K M6 X 5OMM CSK CAP WOOD SCREW A1 A2 A3 M8 X 30MM WOOD DOWEL 32 PCS 9 10 11 APRON BONE BACK DRAWER BOTTOM 14 DRAWER SLIDE K1 L R K2 L R 5 8 NAIL 2 SETS 6 PCS 52 PCS 1 PC 1 PC 1 PC 1 PC 1 PC 2 PCS 2 PCS M3 5 X 16MM C B SCREW M4 X 38MM C B SCREW M4 X 30MM C B SCREW 28 PCS 2 ...

Страница 2: ...nting positions 10 x20 PRESS B 6 6 6 A2 x4 ROTATE 12 PRESS A1 x4 Fix hardware K1 L R into panel 3 4 and 5 with hardware E Repeat 3 times for each hardware SCREWDRIVER REQUIRED x3 ROTATE x3 x3 ROTATE ROTATE K1 L E E E Third hole from the edge First hole from the edge Small hole at the center K1 R K1 L Fix hardware K1 R into panel 5 with hardware E Repeat 2 times for each hardware SCREWDRIVER REQUIR...

Страница 3: ... OR HARDWARE D SCREWDRIVER REQUIRED In this step hardware A1 A2 and B are pre inserted ROTATE Section View x4 A2 A1 x4 PRESS A3 12 SCREWDRIVER REQUIRED Assemble panel 13 with panel 11 by using hardware F Repeat 2 times ROTATE F x2 12 SCREWDRIVER REQUIRED Assemble panel 2 with panel 10 11 and 12 by using hardware G Repeat 12 times ROTATE G x12 HAMMER REQUIRED Assemble panel 9 to entire body with ha...

Страница 4: ...ing hardware G Repeat 16 times SCREWDRIVER REQUIRED x16 G ROTATE 16 15 14 16 16 15 Assemble panel 17 to entire body with hardware H Repeat 24 times HAMMER REQUIRED x24 HIT H 16 14 15 16 17 16 Assemble hardware K2 L R to panel 17 by using hardware E Repeat 3 times for each hardware SCREWDRIVER REQUIRED x4 E x4 E x4 E ROTATE ROTATE ROTATE Hole at the center Third hole from the edge Third hole from t...

Отзывы: