nuhoom CAPRI 343038 Скачать руководство пользователя страница 2

CODING

343038

CAPRI

ASSEMBLY GUIDE

 / 5

2

STEP 6

STEP 4

STEP 2

STEP 5

STEP 3

STEP 1

1

7

3

4

5

3

5

3

5

7

2

3

4

5

7

1

2

3

4

5

7

- Insert hardware A1 onto panel (7).
  (Repeat 4 times.)
- Insert hardware A2 onto panel (1).
  (Repeat 6 times.)

SCREWDRIVER

REQUIRED

* Ensure the arrows on hardware A1 point towards mounting positions.

A2

x6

ROTATE

PRESS

A1

x4

- Insert hardware A1 onto panel (3), (4) and (5).
  (Repeat 6 times.)
- Insert hardware A2 onto panel (3) and (5).
  (Repeat 4 times.)
- Insert hardware onto panel (3), (4) and (5).
  (Repeat 12 times.)

* Ensure the arrows on hardware A1 point towards mounting positions.

PRESS

A1

x6

x12

PRESS

B

Fix hardware N1 (L/R) into panel (3) and (5) with hardware E.

(Repeat 3 times for each hardware.)

SCREWDRIVER

REQUIRED

x6

ROTATE

x6

x6

ROTATE

ROTATE

N1(L)

E

E

E

Third hole from the edge.

First hole from the edge. Small hole at the center.

N1(R)

- Attach panel (3) and (5) to panel (7).
- Insert all hardware A2 into A1.
- Rotate all A1 until tight.
- Apply A3 onto all A1.
  (Repeat 4 times.)

OR

HARDWARE

D

SCREWDRIVER

REQUIRED

* In this step hardware A1A2 and B are pre-inserted.

- Attach panel (1) to panel (3), (4) and (5).
- Insert all hardware A2 into A1.
- Rotate all A1 until tight.
- Apply A3 onto all A1.
  (Repeat 6 times.)

OR

HARDWARE

D

SCREWDRIVER

REQUIRED

* In this step hardware A1A2 and B are pre-inserted.

Section View

ROTATE

A1

x4

A2

x4

PRESS

A3

Connect panel (2) to panel (3), (4) and (5)

by using hardware and D.

(Repeat 6 times.)

ROTATE

x6

C

D

* In this step hardware B are pre-inserted.

HARDWARE

D

ROTATE

Section View

x6

A2

A1

x6

PRESS

A3

5

A2

x4

ROTATE

Содержание CAPRI 343038

Страница 1: ...ARE A B C D E F G 10 SETS ALLEN KEY M4 1 PC BOTTOM PANEL DRAWER FRONT UP CENTER PANEL H I J K M6 X 5OMM CSK CAP WOOD SCREW A1 A2 A3 M8 X 30MM WOOD DOWEL 12 PCS 9 10 11 DRAWER BOTTOM 14 DRAWER SLIDE N1 L R N2 L R 5 8 NAIL 3 SETS 6 PCS 60 PCS 1 PC 1 PC 1 PC 1 PC 1 PC 1 PC 2 PCS 4 PCS M3 5 X 16MM C B SCREW M4 X 38MM C B SCREW M3 X 12MM C B SCREW 24 PCS 4 PCS 48 PCS DRAWER SIDE DRAWER BACK 12 13 14 15...

Страница 2: ... Repeat 3 times for each hardware SCREWDRIVER REQUIRED x6 ROTATE x6 x6 ROTATE ROTATE N1 L E E E Third hole from the edge First hole from the edge Small hole at the center N1 R Attach panel 3 and 5 to panel 7 Insert all hardware A2 into A1 Rotate all A1 until tight Apply A3 onto all A1 Repeat 4 times OR HARDWARE D SCREWDRIVER REQUIRED In this step hardware A1 A2 and B are pre inserted Attach panel ...

Страница 3: ...dware D and L Repeat 8 times HARDWARE D ROTATE x8 D L 15 16 16 16 Connect Metal Frame 15 to panel 2 by using hardware D and K Repeat 6 times ROTATE x6 K D HARDWARE D 16 16 15 x4 PRESS Insert hardware I into mounting positions on panel 4 and 5 by hand Repeat 4 times I 16 16 15 Assemble panel 6 into between panel 4 and 5 Repeat 1 times In this step hardware I are pre inserted 15 16 Fix hardware M on...

Страница 4: ...bled in panel 9 15 Fix hardware J onto panel 11 by using hardware F Repeat 4 times SCREWDRIVER REQUIRED ROTATE x4 F 11 J J Assemble panel 12 to panel 10 or 11 and 13 by using hardware G Repeat 12 times x12 G ROTATE SCREWDRIVER REQUIRED 12 13 13 11 J Assemble panel 12 to panel 10 or 11 and 13 by using hardware G Repeat 12 times SCREWDRIVER REQUIRED ROTATE G x12 12 11 12 13 12 12 13 12 12 13 11 J AD...

Страница 5: ...2 L R to panel 14 by using hardware E Repeat 3 times for each hardware N2 L Hole at the center Third hole from the edge Third hole from the edge x6 E x6 E x6 E ROTATE ROTATE ROTATE Hardware N2 L R shall be leaning against panel 10 or 11 when assembling SCREWDRIVER REQUIRED N2 R 12 11 12 13 14 N2 L N2 R 12 10 12 13 14 N2 L N2 R 12 Put all the drawer in place along the drawer slides 11 15 16 16 STEP...

Отзывы: