Tesano
| 13
Step 7
Installing Wire Management Covers
Locate the wire management
channels.
Ensuring that the power duplex
lines up with the cutout, fasten the
wire management channel using
silver screws (hardware #1) and
black screws (hardware #3).
The label will be facing the top
The silver screws (hardware #1)
must be used on the raised
surface, while the black screws
(hardware #3) should be used on
the lower surface