Tesano Conference Installation Instructions
Rev. 05/18/2016
Страница 1: ...Tesano Conference Installation Instructions Rev 05 18 20 ...
Страница 2: ...um of 2 people are required for this assembly For 96 tables and larger it is recommended to have 3 or 4 people available for the install These instructions reflect typical assemblies They may not match your specific configuration Note This table will be assembled right side up Tesano 2 ...
Страница 3: ...Required Tools Hardware Drill Driver 2 Phillips Bit Laser Level Allen Wrench 1 2 3 4 5 6 Tesano 3 ...
Страница 4: ...Tesano Conference Tesano 4 ...
Страница 5: ...Tesano Exploded 1 2 5 4 6 1 Work Surface 2 Top Beams 3 Mending Plate 4 Base 5 Rail Key 6 Wire Management 7 Power Rail 7 Tesano 5 ...
Страница 6: ...ases before beginning assembly Loosen bolts 6 in the keys attached to the beam Insert the beams with rail keys attached into each of the bases with the THIS SIDE UP label facing up and pilot holes facing ground Use labels to attach correct beams to correct bases ...
Страница 7: ...ware 4 into the holes along the top edge of base end Place top onto beams sliding one end into the pins hardware 4 of one base Repeat with the base on the opposite end Tighten the cams to bring the two surfaces flush Make sure the ends match labels ...
Страница 8: ...to the bases prior to attaching mending plates Square the base up to the top before securing the mending plates Attach mending plate along the center of the metal spacer Pilot holes should be present Attach smaller mending plates in between the edge of the table and the top wood rails ...
Страница 9: ...the mending plates secured in place secure the top beams to the wood rails using hardware 5 long silver screws The pilot holes in the beam should be facing the ground Using the cap screws hardware 6 shown at right insert into side of rail keys ...
Страница 10: ...top beam between the base and tighten cap screws ensuring bottom of beams are flush with one another Secure the top beams to the wood rails using hardware 5 long silver screws The screws will go through the slotted openings along the face of the beam ...
Страница 11: ...Aprons Locate notch place in apron toward end of table Place the aprons between the inside of the side rail and the black beam and fasten them using supplied silver screws hardware 2 Screws will go through the aluminum extrusion ...
Страница 12: ... Wire Management Step 1 Attach jumpers to receptacles Step 2 Run the jumpers around the table in a u shape design Step 3 At one end of the table the plug in feed or hardwire should run through the leg Jumper Jumper Plug in Infeed ...
Страница 13: ...the power duplex lines up with the cutout fasten the wire management channel using silver screws hardware 1 and black screws hardware 3 The label will be facing the top The silver screws hardware 1 must be used on the raised surface while the black screws hardware 3 should be used on the lower surface ...
Страница 14: ...he power rail unit will come with two black brackets which should be inserted first into the rail The silver bolts should be inserted into the bracket before inserting into rail Place power unit over screws Tighten nuts to secure unit to the rail ...