background image

3

17. 03. 22. Document Number  671218

Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk

 OPUS100/150-M

Installation Manual

Motor Plate Assembly Replacement

Motor plate 
locates into 
bottom channel

Terminal 
block 

Control 
module 
pulls out 
to remove

B

 

Plenum 
plate

Control 
module

Motor plate 
fixing screws (2)

Drop motor plate 
assembly forward 
during fitting 
to plenum

6.0 CONTROLS

All the control functions and adjustments are located on the electronic 
control module. An adjusting tool is provided clipped to the blower 
casing.

6.1 Run-On Timer (A)

The overrun feature is only active when the fan is connected to a 
switched live as in wiring diagram 4 on page 2. The overrun time is 
factory set at zero, fully anti clockwise and can be adjusted up to 
thirty minutes by turning the adjustment clockwise. Test by activating/
deactivating the switched live circuit.

6.2 Full (MAX) Speed (B)

The full/MAX speed is factory set at 100%, fully clockwise and can be 
adjusted down to 50% (fully anti clockwise) by adjusting the setting 
screw anti clockwise with the setting tool supplied.

6.3 Low (MIN or Trickle) Speed (B)

The low or trickle speed is factory set at zero, fully anti clockwise and 
can be adjusted upwards to a maximum of 50% speed by turning the 
adjusting screw clockwise with the setting tool supplied.

The fan must be wired as diagram 5 on page 2 and activated via the 
switched live for the trickle (low speed) to boost (max speed) to be 
operative.

Control Module Adjustments

Fail LED

(A) Run On 
Timer

Run LED

(B) Full Speed
50 - 100%

(C) Low Speed 
0 - 50% (trickle vent)

Fan motor socket

Remote status 
indicator socket

5.0 ELECTRICAL INSTALLATION

Offer the single phase supply wiring, 230V switched live wire and the 
wires of any externally installed sensors or controls via the case side 
grommets.

To ease electrical connection, remove the six-way termination 
block.

The mains wiring must be from a fixed wiring installation 
and both mains and switched live must be connected via a 
common local isolator.

The earth wire must be connected to the earth post provided 
and not to the six-way termination block.

Refer to remote sensor data sheets for their installation and 
connection.

5.1 Wiring Diagrams

5.1.1 Full Speed Only

 

Wiring - Full Speed Only

3

1

N

L

2

N

L

Fuse 2A max

Unit Terminal Block

Link for switched live

Earth 
post

5.1.2 Trickle Vent / Boost and Timed Overrun

 
 

Wiring - Trickle Vent / Boost and Timed Overrun

3

1

N

L

2

N

L

Fuse 2A max

Unit Terminal Block

Earth 
post 

5.2 Motor Plate Assembly Replacement

Remove the cover and withdraw the ‘V’ shape filter from the case. Lift 
out the loose blower assembly, remove the two motor retaining screws 
(A) which will be used to fix the motor plate into position.

Tilting the top of the mounting plate forwards, locate the bottom of 
the plate into the channel provided in the case (C). Swing up the motor 
flush with the plenum (B) and secure with the two fixing screws (A). 
Expand ‘V’ shape filter and fit into case.

Finally locate the control module into the blowers’ moulded guides 
and push the module in to the terminal block, ensuring that spade 
connections are engaged. Connect the motor plugs and remote status 
indicators (if used) to the sockets in the control module.

Turn on mains power and test run the unit.

Отзывы: