NuAire MRXBOXAB-ECO5-AE Скачать руководство пользователя страница 4

4

30. 06. 20. Document Number  671957

Nuaire | 

Western Industrial Estate 

Caerphilly 

CF83 1NA 

|

 

nuaire.co.uk

MRXBOXAB-ECO5-AE

Installation Manual

3.4 Extract / Input Areas

The unit is designed to extract air from all wet rooms e.g. bathroom, 
kitchen, en-suite, utility room (with sink).  WC’s do not need to be 
ventilated if openable windows are fitted.

Supply air should be to all habitable rooms e.g. bedrooms and lounge. 
Extract / input grilles should be adjustable valve types (not supplied). 
External grilles are to have a minimum free area of 12,250 sq. mm.

3.5 Ducting

Before commencing ducting installation reference should be made 
to building regulations document “Domestic ventilation compliance 
guide”. This document supports ADF2010 and details installation, 
testing and commissioning of all ventilation systems.

It is recommended that rigid ducting be used at all times. Flexible 
ducting has a very high resistance and it is impossible to calculate how 
much resistance will be on a system if used.

If used the flexible ducting must be kept to a minimum and should 
always be pulled taut. A maximum of 300mm should be used on each 
leg.

To prevent condensation on the outside of the outside air inlet duct and 
the air outlet duct from the unit, these ducts should be insulated. 

Ducting must be installed in such a way that resistance to airflow is 
minimised. Bends should be kept to a minimum.

A minimum distance of 300mm between the appliance and any bends 
in ductwork is recommended.

Ideally 150mm diameter or 204 x 60mm rectangular ducting should be 
used (Figures 12 & 13).

Ducting joints must be sealed with silicone type sealant and shall be 
adequately and reliably fixed to the appliance.

3.6 Ventilation Flow Rates

ADF 2010 - Extract Ventilation Rates

Room

Minimum High rate

Minimum Low Rate

Kitchen

13 l/s

Total extract rate 

should be at least 

the whole dwelling 

ventilation rate given 

in table 2.

Utility Room

8 l/s

Bathroom

8 l/s

Sanitary 

Accommodation

6 l/s

Whole Dwelling Ventilation Rates 

Number Of Bedrooms In Dwelling

1

2

3

4

5

Whole dwelling 

ventilation rate 

(l/s)

1,2

13

17

21

25

29

Notes: 

1. In addition, the minimum ventilation rate should be no less than 0.3 

l/s per m² of internal floor area.  (This includes all floors, e.g. for a two-

story building add the ground and first floor areas).
2. This is based on two occupants in the main bedroom and a single 

occupant in all other bedrooms. This should be used as the default 

value. If a greater level of occupancy is expected add 4 l/s per occupant.

Any air intake terminal must be installed in accordance with the 
appropriate regulation. As a guide, the BS5440 series of British 
Standards deals with this issue and currently states that an air 
intake must be at a minimum distance of 300mm from a gas 
boiler balanced flue. Installers are advised to be aware of the 
requirements of this standard when installing ‘through the wall’ 
supply air ducting.

3.7 ADF 2010 Ventilation Calculations Design of MVHR 
Systems

The MVHR system has been sized for the winter period. Additional 

ventilation may be required during the warmer months and it has 

been assumed that the provisions for purge ventilation (e.g. openable 

windows) could be used.

Step 1: 

For any design air permeability, determine the whole dwelling 

ventilation supply rate from 

Whole Dwelling Ventilation Rates table.

As an alternative where the design air permeability is intended to be 

more than (>) 5m3/(h.m2) 50 Pa, allow for infiltration for all dwelling 

types by subtracting from the whole dwelling ventilation supply rate 

from Whole Dwelling Ventilation Rates table;

 0.04 x gross internal 

volume of the dwelling heated space (m3).

Step 2:

 Calculate the whole dwelling extract ventilation rate by 

summing the individual room rates for ‘minimum high rate’ 

from ADF 

2010 - Extract Ventilation Rates table.

(For sanitary accommodation only, as an alternative, the purge 

ventilation provisions given in ADF 2010 can be used where security is 

not an issue. In this case ‘minimum high extract rate’ for the sanitary 

accommodation should be omitted from the step 2 calculation).

Step 3:

 The required airflow rates are as follows:

The maximum whole dwelling extract ventilation rate (e.g. boost) 

should be at least the greater of step 1 and step 2. Note that the 

maximum individual room extract rate should be at least those 

given in 

ADF 2010 - Extract Ventilation Rates table.

The minimum air supply rate should be at least the whole building 

ventilation rate found in step 1.

For Scotland refer to BRE Digest 398.
For further information refer to “Domestic Ventilation Compliance 

Guide” www.planningportal.gov.uk/buildingregulations/approved 

documents/partl/compliance.

To SVP 

“T” piece 

MVHR Drain 

To unit 

To CONTRAP 

10 

"T" Piece CONTRAP & MVHR Drain Connection

When using a “T” Piece to connect the CONTRAP drainage and 
the MVHR drain pipework the MVHR drain must always be fitted 
before the “T” Piece to prevent condensate from feeding back into 

the MVHR system.

Содержание MRXBOXAB-ECO5-AE

Страница 1: ... This unit must be earthed Ducting must be securely fixed with screws to the spigot to prevent access to live parts Duct runs terminating close to the fan must be adequately protected by suitable guards If the supply cord is damaged it must be replaced by the manufacturer its service agent or similarly qualified persons in order to avoid a hazard Precautions must be taken to avoid the back flow of...

Страница 2: ...r months 1 2 3 Airflow Through unit Standard Unit Airflow Through OH unit Opposite Hand Unit Transport Fixings 3 0 MECHANICAL INSTALLATION Installation must be carried out by competent personnel in accordance with the appropriate authority and conforming to all statutory governing regulations All mains wiring must be in accordance with the current I E E Regulations or the appropriate standards Ens...

Страница 3: ...ceiling but as a minimum should be a least 2m high Fix the mounting bracket to the wall Figure 3 and use the wall mounted bracket to mount the unit on Figure 5 25 25 704 crs 9 1 dia 30 94 94 33 3 3 Condensate Drain The MVHR unit inside the enclosure is fitted with a straight coupling to allow 21 5mm overflow pipe not supplied to be attached using solvent cement the pipe should be passed through th...

Страница 4: ... all other bedrooms This should be used as the default value If a greater level of occupancy is expected add 4 l s per occupant Any air intake terminal must be installed in accordance with the appropriate regulation As a guide the BS5440 series of British Standards deals with this issue and currently states that an air intake must be at a minimum distance of 300mm from a gas boiler balanced flue I...

Страница 5: ...sture levels are likely to occur Therefore it is advisable that if the installation and building works are complete the unit is left running If the building works are not complete please close the air valves or cover up the air valves to prevent condensation forming in the ductwork and the MRXBOX unit due to natural migration of warm air 3 8 Dimensions 11 Unit Dimensions 754 5 2 7 525 5 5 227CRS 1...

Страница 6: ...sulated Insulated supply duct Top of ceiling void Air supply to bedrooms in ceilings via Air Valve mounted unit Nuaire wall MVHR DRAIN Condensate drain uninsulated drain pipe with min 5o fall running to SVP Insulated extract duct Exhaust air from kitchen bathroom to outside via air brick Minimum distance as specified in building regulations Intake air from outside via air brick All duct between MV...

Страница 7: ...when the cover is re fitted 16 17 18 Unit Serving Kitchen Unit Serving Kitchen And Bathroom Unit Serving Kitchen And Two Bathrooms MAINS 230V 50Hz N L 3 Position Switch Ancillary code MRXBOX95 3SWITCH Blue Green yellow Brown Black Supply cord from unit Grey L 1 2 Fuse 5A MAINS 230V 50Hz N L 3 Pole Isolator 3 Position Switch Ancillary code MRXBOX95 3SWITCH Blue Green yellow Brown Black Supply cord ...

Страница 8: ...nit Control On Front Panel Standard Configuration Only Unit Control On Front Panel Standard Configuration Only 5 2 Status Indication The status of the unit is indicated by a series of LED s on the front cover The variants are listed below The display on the unit control panel will not indicate when a higher speed setting has been triggered by an external source such as an ES PIR2 etc HX Bypass AB ...

Страница 9: ...f automatically after 5 Days Remove the filter covers on the front panel of the unit by gripping the two circular tabs either end of the filter covers and pulling away from the unit The filter can now be extracted by pulling the black removal loop on the front edge of the filter Once the filters have been inspected return or replace them as necessary 21 Removing Filter Covers 7 0 WARRANTY The 5 ye...

Страница 10: ...10 30 06 20 Document Number 671957 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOXAB ECO5 AE Installation Manual NOTES ...

Страница 11: ...11 30 06 20 Document Number 671957 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOXAB ECO5 AE Installation Manual NOTES ...

Страница 12: ...12 30 06 20 Document Number 671957 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOXAB ECO5 AE Installation Manual NOTES ...

Отзывы: