MRXBOXAB-ECO2B-AE(H)SW

Installation Manual

5.0 COMMISSIONING

The filters fitted inside the unit are protected with a plastic film. 
Prior to commissioning remove the covers (Figure 20, take off the 
film and replace.

For the required air flow rates please refer to the design 
specification for the property, follow Scetion 3.7, or refer to 
building regulations ADF 2010.

The unit is supplied with independent control for both normal and 
boost airflows (Figure 18). 

Correct commissioning is essential to ensure the ventilation air 
flow rates are met. It also ensures the unit is not over ventilating 
and causing excessive power consumption. 

Commissioning should be carried out in accordance with building 
regulations document “Domestic ventilation compliance guide”. 
www.planningportal.gov.uk/building regulations/approved 
documents/partf/associated 
A calibrated moving vane anemometer and hood will be required 
to carry out commissioning.

Adjustment valves should be locked in place to prevent further 
adjustment. 

Once commissioned the home owner / tenant should be informed 
that the unit should not be adjusted as it will have a detrimental 
effect on the indoor air quality and could result in condensation 
and mould growth. The clear panel covering the control has 
an adhesive panel which should be exposed and sealed post 
commissioning to prevent tampering.

Speed 1 is limited to never exceed speed 2, when commissioning 
speed 2 should always be set first.

 

18 

Front Panel Unit Control Detail

Humidity adjustment situated 
behind front panel, panel must 
be removed for access.  

This should only be carried 
out by a qualified person.

+

-

Post commissioning remove
adhesive backing and seal 

Power Fan

Failure

+

-

Ventilation Controls

- +

+

- +

-

Speed 1 

- +

Speed 2 

Speed 3

Supply  Extract  Supply  Extract  Supply  Extract

6.0 CONTROLS

6.1 Humidity Adjustment

This product contains an internal humidity sensor fitted into the air-
flow extracting from the wet rooms. When the unit senses that the 
humidity exceeds the set point the unit will boost to that set by the 
commissioned boost speed. The set point can be found behind the front 
of the unit (Figure 18) and is at its least sensitive when turned fully 
clockwise. Note that the sensor is measuring humidity from all the wet 
rooms at the same time and should not be relied on to solely boost 
the unit. Additional switch should be used local to the wet rooms (see 
wiring diagrams).

Adjustment only to be carried out by qualified person, isolate 
power before removing cover.

6.2 Status Indication

The status of the unit is indicated by a series of LED’s on the front cover. 
The variants are listed below.

The display on the unit control panel will not indicate when a 
higher speed setting has been triggered by an external source.

19 

LED Indicators

HX Bypass

(AB units only)

Speed 1

Speed 2

Speed 3

Supply Fan Fault

Extract Fan Fault

Frost Protection

Filter Change

6.3 Integral Automatic HX Bypass

Intake and extract temperatures are monitored at the point the 
airflows enter the unit, if the range falls within the set parameters the 
bypass damper is opened automatically to target an indoor comfort 
temperature all year round.

The extract temperature is an average from all wet rooms. If this 
exceeds 25°C the unit may go into bypass depending on outside 
temperatures.

6.4 Summer / Winter Switch

When the switch position is set to Summer the integral automatic 
summer bypass is fully operational, in the alternative Winter position 
the HX bypass is disabled to ensure the unit is constantly in heat 
recovery mode.

6.5 Speed 3 Operation (SW Units Only)

Speed 3 will be non-operational if the intake temperature is greater 
than the extract temperature.

6.6 Frost Protection

In the event of the intake air temperature at the unit dropping below 
the predetermined set point (-5°C as standard) the supply fan will 
reduce to minimum speed, once the temperature rises above the set 
point the fan will return to its commissioned speed.

Please note this mode will only activate after ten days of continuous 
run time. If commissioning of the unit is outside of this time frame 

Содержание MRXBOXAB-ECO2B-AEHSW

Страница 1: ...ion concerning the safe use of the appliance by a person responsible for their safety Children shall not play with the appliance Cleaning and user maintenance shall not be carried out by children 1 1 Hazard Symbols REFER TO INSTRUCTION MANUAL Read and understand the installation and maintenance manual before installing operating or maintaining this product 1 2 Important Information This manual con...

Страница 2: ...y do not play with the appliance 3 0 MECHANICAL INSTALLATION Installation must be carried out by competent personnel in accordance with the appropriate authority and conforming to all statutory governing regulations All mains wiring must be in accordance with the current I E E Regulations or the appropriate standards Ensure that the mains supply Voltage Frequency and Phase complies with the rating...

Страница 3: ...mple Collar 9 Condensate Drain MVHR DRAIN Condensate Drain Uninsulated Drain Pipe With Min 5 Fall Running To SVP 3 2 1 Solid Wall Mounting Recommended The MVHR unit fixed to a solid wall construction using the mounting bracket provided Ducting in the ceiling void Side view of unit mounted on the block wall in a cupboard using MVHR DRAIN the wall brackets Condensate drain uninsulated drain pipe wit...

Страница 4: ...S5440 series of British Standards deals with this issue and currently states that an air intake must be at a minimum distance of 300mm from a gas boiler balanced flue Installers are advised to be aware of the requirements of this standard when installing through the wall supply air ducting 3 6 Ventilation Flow Rates 3 6 1 ADF 2010 Extract Ventilation Rates Room Min high rate Min low rate Kitchen 1...

Страница 5: ...out very high moisture levels are likely to occur Therefore it is advisable that if the installation and building works are complete the unit is left running If the building works are not complete please close the air valves or cover up the air valves to prevent condensation forming in the ductwork and the MRXBOX95 unit due to natural migration of warm air 3 9 Dimensions 11 Dimensions 706 1 1 6 44...

Страница 6: ...rain pipe with min 5 o fall running to SVP Insulated extract duct 12 Typical Ducted Arrangement For A Wall Mounted Unit Using Circular Ducting 3 10 2 Rectangular Ducting Exhaust air from kitchen bathroom to outside via air brick Minimum distance as specified in building regulations Intake air from outside via air brick All duct between MVHR unit and atmosphere to be insulated Insulated supply duct...

Страница 7: ...PEED 1 SPEED 2 SPEED 3 4 2 Wiring Diagrams 4 2 1 Unit Serving Kitchen Bathroom Optional Controls For further information regarding optional controls contact Nuaire on 02920 858 400 Disconnection from the supply mains must be incorporated within the fixed wiring in accordance with the wiring regulations and shall have a minimum contact separation of 3mm 3A Fuse BS 1362 MAINS 230V 50Hz Light Room Li...

Страница 8: ...the air flow extracting from the wet rooms When the unit senses that the humidity exceeds the set point the unit will boost to that set by the commissioned boost speed The set point can be found behind the front of the unit Figure 18 and is at its least sensitive when turned fully clockwise Note that the sensor is measuring humidity from all the wet rooms at the same time and should not be relied ...

Страница 9: ...f the UK should contact Nuaire International Sales office for further details Failure to maintain the unit as recommended will invalidate the warranty 9 0 END OF LIFE AND RECYCLING Where possible Nuaire use components which can be largely recycled when the product reaches its end of life Fans motors controls actuators cabling and other electrical components can be segregated into WEEE recycling st...

Страница 10: ...10 17 11 21 Document Number 672002 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOXAB ECO2B AE H SW Installation Manual NOTES ...

Страница 11: ...11 17 11 21 Document Number 672002 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOXAB ECO2B AE H SW Installation Manual NOTES ...

Страница 12: ...12 17 11 21 Document Number 672002 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOXAB ECO2B AE H SW Installation Manual NOTES ...

Отзывы: