3.8 Typical Ducting Installation - Standard Unit Configuration

Typical Ducting Installation - Standard Unit Configuration

Supply air to 

lounge via

in ceilings.

Air Valve  

Extract air from 

kitchen via 

in ceilings.

Air Valve  

Supply air to 

bedrooms via

in ceilings.

MVHR-DRAIN 

Air Valve  

condensate drain,

running to SVP.

mounted unit.

Nuaire ceiling void 

Extract air from 

bathroom via 

in ceilings.

Air Valve  

Exhaust air from 

kitchen/bathroom to 

outside via air brick.

Supply and extract 

ducts from external 

air bricks to the unit 

needs to be insulated.

Top of ceiling void.

Minimum distance as 

specified in Building 

Regulations. 

Intake air from 

outside via air brick.

3.9 Dimensions (mm) - Opposite Hand Unit Configuration

Dimensions (mm) - Opposite Hand Unit Configuration

688 Hole Centres

View from top (A)

700

View from control side

900 

37

1

857

885 hole centres 

121

End view

200

67

(B)

(A)

600 

Spigot 2.

View from underside with cover removed (B)

Air

Supply 

Spigot 3.

Extract 

Air

Spigot 4.

Air

Exhaust 

Spigot 1.

Air

250

Intake 

Heat 

exchanger

Bypass 

chamber

Supply

fan

Extract

fan

21.5mm condensate pipe

Drip tray 

Wire

frame

filter

Wire

frame

filter

Bypass 

4.

damper 

1.

2.

3.

735 (Filter access distance)

Removable

access

filter

Removable

access

filter

69

97

342

Access 
Requirements

Содержание MRXBOXAB-ECO-LP2B

Страница 1: ...supervision or instruction concerning the safe use of the appliance by a person responsible for their safety Children shall not play with the appliance Cleaning and user maintenance shall not be carr...

Страница 2: ...r to be removed and provide sufficient access for maintenance such as filter change The fan must be installed indoors in a suitable ceiling void away from direct sources of frost heat water spray or m...

Страница 3: ...r of bedrooms in dwelling 1 2 3 4 5 Whole dwelling ventilation rate l s 1 2 13 17 21 25 29 1 In addition the minimum ventilation rate should be no less than 0 3 l s per m2 of internal floor area This...

Страница 4: ...be at least those given in table 1 for minimum high rate The minimum air supply rate should be at least the whole building ventilation rate found in step 1 For Scotland refer to BRE Digest 398 For fur...

Страница 5: ...k Supply and extract ducts from external air bricks to the unit needs to be insulated Top of ceiling void Minimum distance as specified in Building Regulations Intake air from outside via air brick 3...

Страница 6: ...on the same metal cable tray as other cables The electrical connection of the unit must be carried out by a qualified electrician The unit is supplied with a flexible cord for connection to the mains...

Страница 7: ...2 Speed 1 Speed 2 14 Commissioning Controls 6 0 CONTROLS 6 1 Integral Automatic HX Bypass AB Units Only Intake and extract temperatures are monitored at the point the airflows enter the unit if the ra...

Страница 8: ...al Sales office for further details Failure to maintain the unit as recommended will invalidate the warranty 9 0 END OF LIFE AND RECYCLING Where possible Nuaire use components which can be largely rec...

Отзывы: