Standard Assessment Procedure 2005 – Appendix Q MVHR Installation Guide 

Page 5 of 6 

 

1.  System Balancing & Calibration 

Decision 

Yes, No or 

N/A

 

Has the air flow been checked using a proprietary device such as 
an anemometer (recommended)? 

 

Have the controls been set following a defined process? 

Refer to figure 3 flow diagram 

 

Have all distribution grilles been locked where possible to minimise 
unapproved occupant adjustment? 

 

 
 
 

   Figure 3 

 

 

 
 
 
 
 
 
 
 
 
 

Ensure all external and internal 

windows and doors are closed 

Set fan speed using manufacturer data 

table 

Set normal daytime air flow on extract 

points starting at location furthest from 

unit 

Set normal daytime air flow on input 

points starting at location furthest from 

unit 

Step 1 

Step 2 

Step 3 

Step 4 

Step 5 

Set fan speed to boost and measure 

extract rates at each location, adjust 

fan speed setting as required to 

achieve required flow 

Содержание MRXBOX95B-WHIH

Страница 1: ...around the installed unit to allow the cover to be removed and provide sufficient access for maintenance such as filter change Please allow a minimum of 250mm in front of the unit The fan must be ins...

Страница 2: ...le valve types not supplied External grilles to have a minimum free area of 12 250 sq mm 2 3 Ducting Before commencing ducting installation reference should be made to building regulations document Do...

Страница 3: ...boost should be at least the greater of step 1 and step 2 Note that the maximum individual room extract rate should be at least those given in table 1 for minimum high rate the minimum air supply rat...

Страница 4: ...ted supply duct Insulated supply duct Minimum 300mm Air supply to lounge via Air Valve Part no V125S in ceilings Extract air from kitchen bathroom via Air Valve Part no V125S in ceilings Air supply to...

Страница 5: ...Pole isolator 3 Pole isolator Kitchen switch Kitchen switch Blue Brown Black Optional summer boost switch Supply cord from unit Green yellow Blue Brown Black Supply cord from unit Optional summer boo...

Страница 6: ...t has to ability to override both the trickle and boost speeds to operate the fan to maximum airflow See wiring diagram for details of operating this facility 6 2 Humidity adjustment This product cont...

Страница 7: ...COMMISSIONING REQUIREMENTS 6 1 General pre commissioning checks relevant to safe operation consist of the following Ensure that no foreign bodies are present within the fan or casing Check electrical...

Страница 8: ...ings assessed under The Building Regulations 2010 specifically SAP 2009 and Approved Documents L and F Completion of this document is therefore only required for dwellings assessed by SAP 2005 Custome...

Страница 9: ...r to overcome particular obstructions If flexible ducting has been used has it been pulled taut to minimise system resistance Has the number of duct bends been minimised to ensure adequate air flow an...

Страница 10: ...y unit been fixed to a stable element of the building fabric e g wall or floor using manufacturer recommended supplied fixing brackets Has the condensation drain been fitted and the pipe insulated Hav...

Страница 11: ...or N A Has the rating label been verified to establish suitability for the installation strategy and whether an earth is required e g voltage class I or II product status Has a local isolator been pro...

Страница 12: ...tion grilles been locked where possible to minimise unapproved occupant adjustment Figure 3 Ensure all external and internal windows and doors are closed Set fan speed using manufacturer data table Se...

Страница 13: ...e customer been advised that opening windows is not recommended during normal use in order to ensure the energy efficient operation and performance of the balanced system Has the customer been advised...

Отзывы: