NuAire MRXBOX95AB-WM2 Скачать руководство пользователя страница 3

3

08. 05. 14. Leaflet Number 671640

Installation and Maintenance

MRXBOX95AB-WM2 Mechanical Ventilation with Heat Recovery & Summer Bypass

603

503

Mounting 

bracket

353

Side view

View from front with cover removed

View from top

Spigots 

4 x 125mm dia.

419

16

90

172

172

3.0 Dimensions 

Figure 6. 

2.5 Air permeability and infiltration

Is the uncontrolled exchange of air between inside and outside

through cracks, porosity and other unintentional openings in

the building. ADF2006 gives an allowance for this in both multi

and single storey buildings, however ADF2010 has an

allowance for multi storey only. Additionally ADF2010  only

applies this allowance for dwellings leaker than 5 m

3

/(h.m

2

) at

50Pa. (See below).

2.6 ADF 2006 Ventilation calculations

Continuous supply and extract

Step 1: 

Determine the whole building ventilation rate 

from Table

2.

Allow for infiltration by subtracting from this value:

n

for multi-storey dwellings: 0.04 x gross internal volume of 

the dwelling heated space (m

3

);

n

for single-storey dwellings: 0.06 x gross internal volume of 

the dwelling heated space (m

3

).

Step 2: 

Calculate the whole dwelling air extract rate at 

maximum operation by summing the individual room rates for

‘minimum high rate’ 

from Table 1.

(For sanitary accommmodation only, as an alternative, the

purge ventilation provisions given in ADF 2006 can be used

where security is not an issue. In this case ‘minimum high

extract rate’ for the sanitary accommodation should be omitted

from the step 2 calculation).

Step 3: 

The required airflow rates are as follows:

n

the maximum extract rate (e.g. boost) should be at least 

the greater of step 1 and step 2. Note that the maximum 

individual room extract rate should be at least those given 

in table 1

. for minimum high rate.

n

the minimum air supply rate should be at least the whole 

building ventilation rate found in step 1.

2.7 ADF 2010 Ventilation calculations

Design of MVHR systems

The MVHR system has been sized for the winter period.

Additional ventilation may be required during the warmer

months and it has been assumed that the provisions for purge

ventilation (e.g. openable windows) could be used.

Step 1:

For any design air permeability, determine the whole

dwelling ventilation supply rate 

from Table 2.

As an alternative where the design air permeability is intended

to be leakier than (>) 5m

3

/(h.m

2

) 50 Pa, allow for infiltration

for all dwelling types by subtracting from the whole dwelling

ventilation supply rate 

from Table 2

; 0.04 x gross internal 

volume of the dwelling heated space (m

3

).

Step 2:

Calculate the whole dwelling extract ventilation rate by

summing the individual room rates for ‘minimum high rate’ 

from

Table 1.

(For sanitary accommmodation only, as an alternative, the

purge ventilation provisions given in ADF 2010 can be used

where security is not an issue. In this case ‘minimum high

extract rate’ for the sanitary accommodation should be omitted

from the step 2 calculation).

Step 3: 

The required airflow rates are as follows:

n

the maximum whole dwelling extract ventilation rate (e.g. 

boost) should be at least the greater of step 1 and step 2. 

Note that the maximum individual room extract rate should 

be at least those given

in table 1.

for minimum high rate.

n

the minimum air supply rate should be at least the whole 

building ventilation rate found in step 1.

For Scotland refer to BRE Digest 398.

Содержание MRXBOX95AB-WM2

Страница 1: ...d provide sufficient access for maintenance such as filter change Please allow a minimum of 350mm in front of the unit The fan must be installed indoors on a suitable wall away from direct sources of...

Страница 2: ...nded Ideally 150mm diameter or 204 x 60mm rectangular ducting should be used Refer to dwelling design drawing figure 7a and 7b on page 4 for further information Ducting joints must be sealed with sili...

Страница 3: ...boost should be at least the greater of step 1 and step 2 Note that the maximum individual room extract rate should be at least those given in table 1 for minimum high rate n the minimum air supply ra...

Страница 4: ...Minimum 300mm Air supply to lounge via Air Valve Part no VS125 in ceilings Extract air from kitchen bathroom via Air Valve Part no VS125 in ceilings Air supply to bedrooms via Air Valve Part no VS125...

Страница 5: ...Pole isolator 3 Pole isolator Kitchen switch Kitchen switch Blue Brown Black Optional summer boost switch Supply cord from unit Green yellow Blue Brown Black Supply cord from unit Optional summer boos...

Страница 6: ...indoor air quality and could result in condensation and mould growth The label covering the control has an adhesive panel which should be removed post commissioning to prevent tampering 6 1 Summertim...

Страница 7: ...ated before carrying out any work Note The supply cable must be replaced by an electrically competent person When ordering spare parts please quote the serial number of the unit and the ARC number of...

Страница 8: ...have no adverse effect on the fan The speed will return to normal once the interference has subsided 5 0 INSTALLATION REQUIREMENTS In addition to the particular requirements given for the individual...

Страница 9: ...ings assessed under The Building Regulations 2010 specifically SAP 2009 and Approved Documents L and F Completion of this document is therefore only required for dwellings assessed by SAP 2005 Custome...

Страница 10: ...r to overcome particular obstructions If flexible ducting has been used has it been pulled taut to minimise system resistance Has the number of duct bends been minimised to ensure adequate air flow an...

Страница 11: ...y unit been fixed to a stable element of the building fabric e g wall or floor using manufacturer recommended supplied fixing brackets Has the condensation drain been fitted and the pipe insulated Hav...

Страница 12: ...or N A Has the rating label been verified to establish suitability for the installation strategy and whether an earth is required e g voltage class I or II product status Has a local isolator been pro...

Страница 13: ...tion grilles been locked where possible to minimise unapproved occupant adjustment Figure 3 Ensure all external and internal windows and doors are closed Set fan speed using manufacturer data table Se...

Страница 14: ...e customer been advised that opening windows is not recommended during normal use in order to ensure the energy efficient operation and performance of the balanced system Has the customer been advised...

Отзывы: