
2
22. 07. 20. Document Number 671812
Nuaire |
Western Industrial Estate
|
Caerphilly
|
CF83 1NA
|
nuaire.co.uk
MRXBOX-FF4
Installation Manual
1
Ducting For Wall Mounted ECO4 MVHR Units
3.2 Final Installation
The MRXBOX-FF4 should be secured to the slab/joists/ceiling using
appropriate fixings (supplied by others), it should be aligned centrally in
both axes (Figure 2) to the corresponding MVHR unit being connected
to minimise misalignment between the ducts.
Appropriate ducting should then be used to connect the
MRXBOX-FF4 to MRXBOXAB-ECO4 or ancillary MRXBOX-SIL4 if used,
suitable clearance should be allowed around any connecting ducting
passing through the ceiling to prevent vibration being transferred to the
building structure.
2
MRXBOX-FF4 Ducting View
SECTION 1. First Fix Plenum Chamber (Code:MRXBOX-FF4)
Rectangular spigots 220 x 90mm.
4 Hanging brackets
Ducting (by others).
Rectangular spigots 220 x 90mm.
Hanging brackets fix to the underside
of the floor slab at first fix stage of
the build.
Optional Ancillary Item MRXBOX-AV4
Sold Separately (Must Be Used If Also
Fitting MRXBOX-SIL4)
SECTION 3. MRXBOXAB-ECO4 MVHR Unit
DUCTING
MRXBOX-FF4 ALIGNED CENTRALLY IN
BOTH AXES TO THE MRXBOXAB-ECO4
SLAB / JOIST / CEILING
FRONT VIEW
SIDE VIEW