NuAire MEV Ecosmart Скачать руководство пользователя страница 4

If the unit boosts at unacceptable times, this dial should be

turned clockwise by a small amount.

5.0 Volume Control

To control the volume of air the unit is equipped with two

control dials, for trickle and boost duties.

In order to comply with the BRE Digest the unit should

be set to give a minimum of the 0.5 air change/hour for the

dwelling continuously, plus 25% boost. To achieve this the

volume of the property should be measured (in m

3

) and this

figure divided by 7.2. This gives the duty required in l/s.

The table below is intended as a guide to achieve the

correct duty (based on 0.5 ACH with 25% boost).

No. of Bedrooms

Typical

Trickle/

Boost

volume

Normal duty l/s

l/s

1

140m

3

19

24

2

200m

3

28

35

3

260m

3

36

45

4

320m

3

44

56

5.1 Run-on Timer

The Run-on timer adjustment is from 0 - 60 mins.

Run-on

is only available from the switched live (SL) signal.

5.2 Start-up Routine

On power up or and after power failure the unit goes

through a 2 minute set-up period.

During this period the unit:

1. Starts at full speed

2. Ramps down to off

3. Restarts at 25% speed

4. Resumes normal operation

5.3 Status Light

Green light - Fan running

Red light - Fan failure

Flashing green light - Set-up period

Flashing red light - Electronics failure

5.4 Calibration

By pressing the calibration button the unit re-sets itself by

switching off for 30 seconds then re-starts at full speed

before ramping down to the desired duty. Whilst running at

full speed the status light flashes to indicate if the duty set

on the adjustment dials can be achieved (green for yes,

amber for no). Checks can be carried out in both the trickle

and boost modes. If the light flashes amber check the

resistance of the ducting, grilles etc. or turn down the

adjustment dial.

6.0 Maintenance

It is inevitable that even with filtered extract grilles as

recommended in BRE digest 398 some dust, fluff etc. will

pass through the filter, and which, if allowed, will build up

internally on motors and impellers, shortening the life of the

unit and, in severe cases, leading to overheating of the

motors.

Consequently, it is strongly recommended that all units are

inspected and cleaned every six months. To clean the filter,

remove from the unit and wash in tepid water to which a

little mild detergent has been added. Shake out excess

water and allow to dry naturally. Replace when dry.

7.0 Cleaning

Remove covers and carefully clean out interiors as

necessary. Check for damage and security of components.

Refit covers.

8.0 Replacement of Parts

Should any component need replacing Nuaire keep extensive

stocks for quick delivery. Ensure that the unit is electrically

isolated, before carrying out any work.

When ordering spare parts, please quote the serial number

of the unit and the ARC number of the purchase if possible.

(This information will be available on the fan label).

9.0 Service Enquiries

Nuaire can assist you in all aspects of service. Our service

department will be happy to provide any assistance required,

initially by telephone and If necessary arrange for an

engineer to call.

Customer Services Department

on 08705 002 555

4

Leaflet Number 671266 July 2007

D2

U1

J1

H1

TH1

50%

80%

Figure 8.

Installation and Maintenance

MEV Ecosmart Continuous Mechanical Extract Ventilation Units

Отзывы: