2
029 2085 8400
10. 05. 17. Leaflet Number 671810
Installation and Maintenance
ES-ISC-WP*
EcoSmart Speed Control Weatherproofing
4.0 MAINTENANCE
4.1 Maintenance Intervals
The first maintenance should be carried out three months after
commissioning and thereafter at twelve monthly intervals.
These intervals may need to be shortened if the unit is operating
in adverse environmental conditions, or in heavily polluted air.
4.2 General Cleaning and Inspection
General cleaning and inspection – Clean and inspect the exterior
of the unit, remove covers and carefully clean out any dust
deposits. Check security of all components and terminals,
remove fan filters and clean or replace as necessary. Refit covers.
A
B
Figure 3. ES-ISC-WP* Drill
hole pattern.
Figure 4. Fixing
Ecosmart speed control
to ES-ISC-WP*
Unit Code
A (mm)
B (mm)
ES-ISC-WPA
379
391.5
ES-ISC-WPB
417
476
ES-ISC-WPC
768
608
Telephone 02920 858 400
5.0 AFTER SALES ENQUIRIES
For technical assistance or further product information,
including spare parts and replacement components, please
contact the After Sales Department.