Warning - Units should be installed with the access

panel on the top never upside down.

Installation and Maintenance

XTRACTOR - ECOSMART Belt Drive Single Fans

2

Installation

Installation must be carried out by competent personnel

in accordance with the appropriate authority and 

conforming to all statutory and governing regulations.

Units must not be installed at an angle over 5

o

from the

horizontal (to ensure the backdraught shutters operate

satisfactorily). 

Units should always be positioned with sufficient space

to allow removal of the access covers and subsequent

removal of fan and motor assemblies etc. 

Ductwork connections must be airtight to prevent loss of

performance. 

The method of mounting used is the total responsibility of

the installer. The lower edge of the casing has an internal

skirt allowing the unit to be located on an upstand or 

prefabricated curb if desired. The units must be securely

screw fixed to the upstand/curb to prevent vibration

and/or wind damage.

It is the installers responsibility to drill the case to provide

access for the electrical cables. Care should be taken not to

damage internal components and the cable entry must be

properly sealed. NOTE: on bottom inlet units the electrical

cabling may be routed up through the bottom inlet spigot.

Testing after installation

Ensure that the Fan unit and any specified controls are 

fitted securely according to the instructions.

Switch on the mains supply. Push the test button to run

each fan and check that they run satisfactorily.

If a switched live signal is used, activate this signal and

check that the fan runs. De-activate the switched live signal

and check the run-on-time; adjust if necessary.

Adjust the set point of any sensors and PIR; check that

they function correctly.

Adjust the maximum and minimum airflow (if required) by

following the commissioning procedures.

Prefabricated Curb

CODES: ESP* (typical)

Manufactured in 

pre galvanised steel 

these curbs will reduce 

design work and guarantee 

correct unit mounting when on site.

Note: Upper faces of curb are fitted 

with robust sealing strip.

Table 5.   Prefabricated curb dimensions

Upstand Details

Details of roof opening dimensions etc required and basic

construction of a builders upstand etc are shown below for

typical concrete and decking roof installations.

Unit

Prefab

Code

Curb Code

A

B

C

ESX 11-12

ESPFC 4B

917

917

250

ESX 13-14

ESPFC 5B

1173

1173

250

ESX 15-19

ESPFC 6BS

1

374

1136

250

A

B

C

Table  6.  Dimensions (mm)

Unit

Prefab

Code

Code

A

B

C

D

E

F

G

ESX 11-12

ESPFC 4B

767

767

947

947

837

837

75

ESX 13-14

ESPFC 5B

973

973

1203

1203

1064

1064

100

ESX 15-19

ESPFC 6BS

1174

936

1404

1166

1265

1027

100

Fig. 4 

Fig. 5

Note: Prefabricated curbs can be used to support internal or external units.

Roof Opening Dimensions

11. 05. 17. Leaflet Number 671177

Содержание ECOSMART XTRACTOR

Страница 1: ...d inlet units Large sizes XTRACTOR 3 phase Belt Drive Roof Plantroom Single Fans Installation and Maintenance Manual 1 11 05 17 Leaflet Number 671177 A B Removable top panel Opposed outlet grilles F E...

Страница 2: ...installation Ensure that the Fan unit and any specified controls are fitted securely according to the instructions Switch on the mains supply Push the test button to run each fan and check that they...

Страница 3: ...ype B RCD should be used trip limit 300mA Otherwise nuisance tripping will occur Because the run and start currents depend upon the duty and associated ductwork of an individual unit the values quoted...

Страница 4: ...Data Cable installation A 4 core SELV data cable is used to connect devices such as sensors to the fan and for interconnecting multiple fan units Do not run data cable in the same conduit as the mains...

Страница 5: ...NET The fan will now adjust it s speed according to temperature To obtain manual control connect a link across L to SL enabling signal and connect a user control in one of the sockets labelled NET Se...

Страница 6: ...ry metre of span length see fig 12 The force required to deflect the V belt should be from 0 5kg to 0 8kg 3 Tighten the pinch bolts General Cleaning and Inspection Clean and inspect the exterior of th...

Страница 7: ...by the equipment panels or by fixed installation detail eg ducting then guarding to the appropriate standard must be fitted 5 2 The electrical installation of the equipment must comply with the requi...