Installation Checklist 

 

 

 

 

1.

 

 

Install piping as per National and local codes. 

 

2.

 

 

Mark the water supply for future reference.

 

3.

 

 

Install a thermostatic mixing valve on the hot 
water outlet of the storage tank. 

 

4.

 

 

Install hot water heater plumbing connections as 

per the water heater manufacturer’s instructions.

 

5.

 

 

Install T&P relief valve on tank in accordance 
with local codes.

 

6.

 

 

Ensure any valves installed between the 
expansion tank and storage tank inlet are left in 
the OPEN position during normal operation. 

7. 

 

Ensure no valve is installed between the relief 
valve and discharge pipe. 

8. 

 

Ensure discharge piping material used is rated to 
withstand temperatures up to 250

o

F (120

o

C).

 

9. 

 

Direct discharge to a safe 

area (drain) where hot 

water or steam will not cause damage or injury

10. 

 

Terminate discharge pipe 6"-12" above the 
floor. Do not connect discharge pipe directly to 
a drain. 

11. 

 

Typical discharge pipe diameter ¾".  Maximum 
pipe length is 15 feet with 2 or less elbows.  

12. 

 

Cut discharge end of pipe at a 45

o

 angle to 

reduce the risk of being blocked or capped.

 

13. 

 

Verify with local codes if a backflow preventor 
or thermal expansion control device is required. 

14. 

 

Install a domestic expansion tank downstream of 
the backflow preventor (control device).

 

15. 

 

Install the domestic expansion tank on the cold 
water supply.

 

16. 

 

Flush the tank thoroughly before filling the tank 
in preparation to heat water.

 

Table 2-3  Storage Tank Dimensions 

Filling the Storage Tank 

 

 

 

 

Model 

Dimensions (inches) 

 

1.  Thoroughly flush the storage tank by drawing 

three (3) times the tank’s volume through it. 
 

 

ST80 

72 

5

/

8

  59 

1

/

2

  59 

1

/

2

  11 

5

/

8

  10 

5

/

8

 

3

/

8

 

23 

7

/

8

   

2.  Verify water connections completed. 

ST120 

64 

3

/

4

  52 

3

/

8

  52 

3

/

8

  13 

1

/

4

  12 

1

/

4

 

3

/

8

 

28 

7

/

8

   

3.  Close drain valve. Open the highest hot water 

faucet. 

Table 2-4  Storage Tank Connections

 

 

 Model 

Connection Port Sizes

 

 

4.  Open valve on cold water inlet and fill system. 

T&P  RV  Hot Out 

Sensor 

HWH In 

HWH Out 

 

 

5. 

 

Fill until a steady stream of water flows from the 
hot water faucet.  

 

 

ST80 

1" 

F

 

1

/

2

" M 

Well 

1

/

2

" M 

1

/

2

" M 

 

6.  Close the hot water faucet. 

ST120 

1" 

F

 

1

/

2

" M 

Well 

1

/

2

" M 

1

/

2

" M 

 

 

7. 

 

Ensure the storage tank is filled and piping is 
free of leaks before proceeding to Operational 
Checklist in Section 4.0. 

 

 

General Notes: 

- Connections are NPT unless noted otherwise.  
- The sensor connection is a friction fit immersion well.

 

 

 
 

 

 

Содержание Trin & Stor ST Series

Страница 1: ...ND DEFINITIONS Danger Sign Indicates a hazardous situation which if not avoided will result in serious injury or death Warning Sign Indicates a hazardous situation which if not avoided could result in...

Страница 2: ...cannot supervise the installation and therefore makes it a specific condition for the warranty that the customer will supervise the installation and use of the product to be sure they are performed i...

Страница 3: ...et be cool enough to prevent scalding Since both hazards present a potential risk to the user they must be monitored and controlled Table 1 4 indicates how water temperature affects Legionella bacteri...

Страница 4: ...y or death This appliance is not intended to convey or dispense water for human consumption such as drinking or cooking Legislation and Guidelines At the time this document was written standards and g...

Страница 5: ...TI warranty and may result in property damage Storage Tank Piping Tank connection ports are identified in Figure 2 1 and dimensioned in Tables 2 3 and 2 4 and their function is described in detail bel...

Страница 6: ...tank is mandatory not optional and must be installed downstream of any device used to control system thermal expansion When using multiple storage tanks check if a single BFP is required on the domes...

Страница 7: ...of being blocked or capped 13 Verify with local codes if a backflow preventor or thermal expansion control device is required 14 Install a domestic expansion tank downstream of the backflow preventor...

Страница 8: ...series water heaters that are wired together as part of a multiple water heater cascade i e when they are Lead Lagged together When using a Trin Stor Storage tank with a cascade water heater system t...

Страница 9: ...t set to the desired Water Heater operating temperature during a DHW demand should be set higher than the Demand Off temperature Typical setting 130 F to 190 F 4 Demand On temperature tank temperature...

Страница 10: ...tenance Checklist 1 Verify maximum water temperature at hot water fixtures to verify mixing valve temperature settings 2 Manually operate T P relief valve by moving lever to open position until hot wa...

Страница 11: ...Storage Tanks Installation and Operation Instructions Trin Stor 11 NOTES...

Страница 12: ...tor Installation and Operation Instructions Storage Tanks 12 NY Thermal Inc 30 Stonegate Drive Saint John NB E2H 0A4 Canada Technical Assistance 1 800 688 2575 Website www ntiboilers com Fax 1 506 432...

Отзывы: