7. MAINTENANCE SCHEDULE
This maintenance schedule contains only the most important operations. Besides of these operations, carry out maintenance and repairs of the machine as necessary
depending on the respective conditions of operation. Check also the engine operation manual.
WARNING:
Turn off the engine before any maintenance or repair activity.
Use genuine spare parts only. Use of non-original spare parts may lead to damage to the machine. The manufacturer will not honor any warranty claim
arising from such reason.
Item
Operation
Initial inspection
After 1st month or 20
hours
Every 3 months or 50
hours
Every 6 months or
100 hours
Engine oil
Inspection of oil level
DAILY
Exchange
Air filter
Inspection
Cleaning
(1)
Spark plug
Inspection - cleaning
Filter bowl
Cleaning
Fuel hose
Inspection - exchange
Every two years
Valve clearance
Inspection - adjustment
Every 12 months or 250 hours (2)
Fuel tank and sieve
Cleaning
Every 12 months or 300 hours (2)
Vibrator
Inspection of oil level, exchange Inspection for tightness - daily
Oil replacement - every 2 years
Drive belt (3)
Tensioning
Rubber mounts
Inspection of the integrity
150 hours
Handle assembly
Lubrication, exchange
1.
To be carried more often when operating in dusty environment!
2.
It is recommended to be carried out by authorized service.
3.
Replacement of drive belt every 300 hours.
4. Bolt connections – check after approx. 100 working hours, if any gets loose, apply the glue and tighten the bolt.
Содержание VD12P
Страница 39: ......