APPENDIX C LN-200 IMU in Universal Enclosure
OEM7 SPAN Installation and Operation User Manual v14
294
Figure 122: Install LN-200 IMU to Base
2. Using a long 3 mm hex bit, install the IMU bracket/SDLC to the base, as shown in
below. Use thread-locking fluid on each M4 screw.
Figure 123: Install Bracket to Base
3. Connect the cable harness to the board assembly and IMU, routing it as shown in
on the next page. Ensure latching of the cable connector housings and fasten the 6-32 screw at the
IMU end using a 5/32” hex bit. Do not use thread-locking fluid and do not overtighten.