![Nova 50-9-2121 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/nova/50-9-2121/50-9-2121_assembly-instructions_1710187002.webp)
Review and identify Retrofit Kit parts listed above.
PACKING LIST
HARDWARE
FIGURE 2
Step 3
Attach Cross Braces (Ref. #3) to Side Assemblies (Ref. #2) using
eight (8) Screws (Ref. #9). Attach Top Rails (Ref. #14) using four
(4) Top Rail Screws (Ref. #15). See Figure 2.
Step 4
Insert Levelers (Ref. #7) into bottom of Side Assemblies (Ref.
#2). See Figure 2.
Step 5
Step 6
8
11
15
16
7
10
12
13
4
Page 2
50-9-2121 Asy. Instr., © Nova Solutions, Inc. 2005
Turn Retrofit Assembly upright. Slide under view port cutout in
worksurface. Align holes in top rails of Side Assemblies (Ref. #2)
with holes in worksurface. Attach Retrofit Assembly to the
worksurface securely using eight (8) Screws (Ref. #10). Optional:
Adjust Levelers (Ref. #7).
9
14
3
8
7
7
3
8
2
8
2
7
7
8
14
14
15
15
15
15
Ref. # Item # Qty. Description
1
20060126
1
Keyboard hanger with glide
– Left
2
5002121SA
2
Side Assembly
3
20060104
2
Cross Brace
4
20060127
1
Keyboard hanger with glide
– Right
5
Varies with Retrofit
1
Keyboard Drawer
6
20060116
1
Monitor Support
7
50900258
4
Leveler
8
1412APPBO
18
Screw - #14x3/4"
9
50900032
6
Screw - #14x1-1/2"
10
TB-M
4
Tracking Block
TB-F
4
Tracking Block
11
6N50TXPZ
8
Screw - Security, #6x5/8"
12
50900034
4
Trim Ring Corner
13
50900037
4
Trim Ring Straight - C
14
5002121-01
2
Top Rail
15
5002121-02
4
Threaded Screw - Top Rail
16
FR2020/Clip
2
Locking Tab
OPTIONS
5081120 1
Power
Strip
5081066 1
CPU
Holder