
3 - INSTALLATION
3-22
17. Adjust the
"Motor Mount Belt Tension Lever"
57
so
the
"Motor Mount Base" 55
is level or parallel with the
top of the U-Trough.
Fig. # 3-54 Motor Mount Base Tension
55
57
18. Support the
"Electric Motor" 58
, and install to the
"Mo-
tor Mount Base" 55
. Secure with
(Qty. 4) "3/8-16"X 2
Carriage Bolts 59 , "3/8 Flat Washers"
60
, &
3/8-16
Nylock Nuts" 61
Fig. # 3-55 Mounting Electric Motor To MM Base
55
59
60
61
58
19. Install the
"Upper Sheave" 62
, &
"Keystock" 63
onto
the
"Electric Motor" 58
shaft
.
Do not tighten the set-
screws at this time.
Fig. # 3-56 Install Upper Sheave
58
63
62
20. Install the
"V-Belts" 58
.
If necessary adjust the
"Motor
Mount Belt Tension Lever"
to give
slack to install belts.
Fig. # 3-57 Install V-Belts
58
Содержание The Grain Handler 10
Страница 12: ...1 6 1 GENERAL INFORMATION This Page Is Intentionally Left Blank...
Страница 40: ...2 SAFETY INFORMATION 2 28 This Page Is Intentionally Left Blank...
Страница 90: ...4 WORKING OPERATIONS 4 12 This Page Is Intentionally Left Blank...
Страница 108: ...5 MAINTENANCE 5 18 This Page Is Intentionally Left Blank...
Страница 112: ...6 TROUBLESHOOTING 6 4 This Page Is Intentionally Left Blank...
Страница 120: ...8 FORMS AND DECLARATIONS 8 2 This Page Is Intentionally Left Blank...
Страница 128: ...i 6 www norwoodsales com 1 800 446 0316...
Страница 129: ......