
2 - SAFETY INFORMATION
2-24
Fig. # 2-33 Informational Decal P/N 90-44-0580 (Qty. 1)
Fig. # 2-34 Informational Decal Location
OPERATING INSTRUCTIONS
STEP 1 - Open center hopper gate first, unload until grain flow stops. Only when NO grain remains
above the center hopper can the intermediate hopper gate(s) be opened.
STEP 2 - Open the intermediate hopper gate(s) until grain flow stops.
STEP 3 - Stop the motor, engage the bin sweep gearbox lever to remove the remaining grain.
STEP 4 - Close all hopper gates and empty the remaining grain from the u-trough.
STEP 5 - Stop the motor, disengage bin sweep gearbox lever, return bin sweep over the hoppers.
STEP 6 - The grain bin is now ready to be refilled.
Содержание The Grain Handler 10
Страница 12: ...1 6 1 GENERAL INFORMATION This Page Is Intentionally Left Blank...
Страница 40: ...2 SAFETY INFORMATION 2 28 This Page Is Intentionally Left Blank...
Страница 90: ...4 WORKING OPERATIONS 4 12 This Page Is Intentionally Left Blank...
Страница 108: ...5 MAINTENANCE 5 18 This Page Is Intentionally Left Blank...
Страница 112: ...6 TROUBLESHOOTING 6 4 This Page Is Intentionally Left Blank...
Страница 120: ...8 FORMS AND DECLARATIONS 8 2 This Page Is Intentionally Left Blank...
Страница 128: ...i 6 www norwoodsales com 1 800 446 0316...
Страница 129: ......