5 - MAINTENANCE
5-6
First 10 Hours Of Operation
Re-Torque Wheel Flange Nuts
1. Unfold the machine into the
Field Position
.
Till Folding & Unfolding” on page 4-11)
2. Lower the disks to the ground by retracting the
Front
Wheel Cylinders
A
and
Rear Roller Cylinders B
.
A
B
Fig. # 5-1 Lower Disks to the Ground
3. Relieve all the hydraulic pressure by placing the tractor
SCV levers to the
FLOAT POSITION
with engine
running for the
Main Frame Lift
&
Wing Fold
cylinders.
4. The machine should now be in the
“Field Lowered Po-
sition”
5. Re-torque wheel flange nuts
A (In A Diagonal Pattern)
at 10 hour intervals or (daily). If bolt torque is stable,
check at 50 hour intervals or (weekly).
350 ft-lbs
475 N-m
10
50
1
2
3
4
5
6
7
8
9
10
Fig. # 5-2 Wheel Flange Nut Tightening Sequence (Diago-
nal Pattern)
A
A
Fig. # 5-3 Wheel Flange Nut Locations HSD1600,
HSD1775, HSD2100, & HSD2450
Содержание Kwik-Till HSD1600
Страница 2: ......
Страница 10: ...1 4 1 GENERAL INFORMATION This Page Is Intentionally Left Blank...
Страница 29: ...2 SAFETY INFORMATION 2 19 Fig 2 6 Warning Decal P N 90 44 0395 Fig 2 7 Safety Decal Location See Fig 2 6...
Страница 31: ...2 SAFETY INFORMATION 2 21 Fig 2 10 Warning Decal P N 90 44 0396 Fig 2 11 Safety Decal Location See Fig 2 10...
Страница 32: ...2 SAFETY INFORMATION 2 22 Fig 2 12 Warning Decal P N 90 44 0508 Fig 2 13 Safety Decal Location See Fig 2 12...
Страница 34: ...2 SAFETY INFORMATION 2 24 Fig 2 18 Danger Decal P N 90 44 0399 Fig 2 19 Safety Decal Location See Fig 2 18...
Страница 90: ...4 WORKING OPERATIONS 4 26 A Fig 4 69 Rear Roller Deflector Locations...
Страница 132: ...5 MAINTENANCE 5 42 This Page Is Intentionally Left Blank...
Страница 142: ...8 FORMS AND DECLARATIONS 8 2 This Page Is Intentionally Left Blank...
Страница 150: ...i 6...
Страница 151: ......