Make sure the surface is clean and leveled.
Place the stations according to positions on
drawings (see the following pages). Drill bolt
holes with a concrete hammer.
Mount the M12/M16 bolts.
Tighten the bolts (M12 = 90 N/m and
M16 = 120 N/m)
,
and cover with the
surface material chosen.
REQUIREMENTS FOR THE CONCRETE
The concrete must comply with the standard
EN197-1 CEM I 52,5 N.
Mixing ratio:
Cement 1/8
Sand
3/8 (max. stone size 4mm / 0,2”)
Stones 4/8 (stone size 16mm / 0,6”)
The concrete must be premixed or mixed in a
mixer. Hand mixing is not acceptable.
For the concrete to settle, it must be vibrated
with a concrete vibrator.
To ensure correct contact between the base
plate and the concrete, the concrete surface
must be 100% plane.
The concrete has to have the strength of
≥52,5 MPa (obtained in approx. 7 days,
but longer in cold weather).
The installation must be carried out by
professionals and according to current
practice.