17
5 Operating the CS 451
5.1 Site of work
Before you start working, please check the following points:
•
Remove from the site anything, which might hinder the working procedure.
•
Make sure the site is sufficiently well lit.
•
Place, when used, the water hose so that it can’t be damaged
•
Make sure you have a continual adequate view of the working area so you can intervene in
the working process at any time.
•
Keep other staff out of the area, so you can work securely.
5.2 Cutting method
In this section, you can find instructions on how to make a straight cut at the desired depth.
5.2.1 Preparing your cut
Before starting the machine,
•
Draw a line on the floor over the cutting length.
•
Make sure you have filled the engine tank with fuel, and the water tank with water, our, when
possible, the machine is connected to the water net. No petrol is supplied with the machine.
•
The engine is shipped with oil. Check oil level before starting. Top up if required.
•
Make sure you have mounted the correct blade as recommended by the manufacturer
depending on the material to be worked, the working procedure (dry or wet cut) to be carried
out, and the efficiency required.
•
Make sure that the flanges securely hold the diamond blade.
•
Make sure that the blade is not touching the floor before starting; you can turn the hand
wheel up to the mechanical stop.
•
Adjust the handle to a comfortable position.
•
Roll the machine until the blade is over the line.
•
Lower the guide-a-cut so it touches the line.
•
Align front cutting guide, guide attached to blade cover and rear cutting guide with the line.
Содержание CS 451 P13
Страница 1: ...CS 451 P13 OPERATING INSTRUCTIONS...
Страница 2: ...2...
Страница 4: ...4...
Страница 26: ...26...
Страница 27: ...27...