background image

19 

Guarantee  can  be  claimed  and  technical  support  obtained  from  your  local  distributor  where 
machines, spare parts and consumables can be ordered as well: 

 
Benelux and France:  

From Saint-Gobain Abrasives  
in the Grand-Duché de Luxembourg 
Free telephone numbers:  
Belgium  :  0 800 18951 
France: 0 800 90 69 03 
Holland: 0 8000 22 02 70 
e-mail: 

[email protected]

 

 

Germany 
Saint-Gobain Diamond Products GmbH 

Birkenweg 45-49, 
D-50389 WESSELING 
Tel : (02236) 8911 0 
Fax : (02236) 8911 30 
e-mail: 

[email protected]

 

 
Spain 
Saint-Gobain Abrasivos S.A. 
C/. Verneda del Congost s/n 
Pol.Ind. El Pedregar 

E-08160 MONTMELÓ (Barcelona) 
Tel: 0034 935 68 68 70 

Fax: 0034 935 68 67 14 
e-mail

[email protected]

 

 
Hungary 
Saint-Gobain Abrasives KFT. 
Banyaleg Utca 60B 
H-1225 BUDAPEST 
Tel: ++36 1 371 2250 

Fax: ++36 1 371 2255 
e-mail: 

[email protected]

 

 
Czech Republic 

Norton Diamantove Nastroje Sro 
Vinohrdadska 184 
CS-13000 PRAHA 3 
Tel: 0042 0267 13 20 21 
Fax: 0042 0267 13 20 21 
e-mail: 

[email protected]

 

United Kingdom 

Saint-Gobain Abrasives Ltd. 
Doxey Road 
Stafford 
ST16 1EA 
Tel : 0845 602 6222 
Free fax : 0800 622 385 
e-mail : 

[email protected]

 

 

Italy 
Saint-Gobain Abrasivi S.p.A. 

Via per Cesano Boscone, 4 
I-20094 CORSICO-MILANO 
Tel: 0039 02 44 851 
Fax: 0039 0245 101238 
e-mail: 

[email protected]

 

 
Austria 
Saint-Gobain Abrasives GmbH 
Telsenberggasse 37, 
A-5020 SALZBURG 

Tel: 0043 662 43 00 76 77 
Fax: 0043 662 43 01 75 

e-mail: 

[email protected]

 

 
Poland 
Saint-Gobain Diamond Products Sp.zO.O. 
AL. Krakowska 110/114 
PL-00-971 WARSZAWA 
Tel: 0048 22 868 29 36 
Tel/Fax: 0048 22 868 29 27 

e-mail: 

[email protected]

 

 

Содержание Clipper CS1 P13

Страница 1: ...CS1 P13 OPERATING INSTRUCTIONS...

Страница 2: ...2...

Страница 3: ...HONDA Cyclonic 70184624214 CS1 P13 HONDA Cyclonic 500 70184629389 is in conformity with the following Directives European Machinery Directive 2006 42 EC Electromagnetic Compatibility Directive 2004 1...

Страница 4: ...4...

Страница 5: ...g 10 3 1 Tool assembly 10 3 2 Water cooling system 10 3 3 Starting the machine 11 4 Transport and Storing 12 4 1 Securing for transport 12 4 2 Transport procedure 12 4 3 Long period of inactivity 12 5...

Страница 6: ...shall be borne entirely by the user Observing the operating instructions and compliance with inspection and servicing requirements shall also be considered as included under use in accordance with the...

Страница 7: ...specified Processes No 8 of the Protection of Eyes Regulation 1974 Regulation 2 2 Part 1 For security reasons never leave the machine unattended untied or unlocked While the engine is running Do not m...

Страница 8: ...ons Being of small construction it can be transported in a car or van The water container is enclosed in the frame All component parts on the CS1 are assembled to a high quality standard ensuring long...

Страница 9: ...the machine in case of danger The water cooling system 8 is composed of a 70 litres water tank a water tank tap and two water nozzles on the blade guard ensuring adequate flow of water to both sides o...

Страница 10: ...ge with the 36mm wrench Remove the outer flange Clean the flanges and blade shaft and inspect for wear Mount the blade on the shaft ensuring that direction of rotation is correct Wrong direction of ro...

Страница 11: ...e emergency switch on the board of the machine is in the correct position Pull the starter grip lightly until you feel resistance then pull briskly CAUTION Do not allow the starter grip to snap back a...

Страница 12: ...heel 4 2 Transport procedure The machine can be moved on a flat surface using its wheels Use the metal hook located on the board of the machine over the motor to move the machine with a crane 4 3 Long...

Страница 13: ...acturer depending on the material to be worked the working procedure dry or wet cut to be carried out and the efficiency required Make sure that the flanges securely hold the diamond blade Make sure t...

Страница 14: ...Adjustment and replacement of the belts After one hour of work the belts heat and stretch Therefore you have to re tension them To adjust the belts firstly remove the belt guard by unscrewing the 2 n...

Страница 15: ...ssary Every 2 years Engine oil To change the oil Remove the oil filler cap dipstick and drain bolt Allow the oil to drain completely Dispose of used motor oil in a manner that is compatible with the e...

Страница 16: ...ever brush the dirt off brushing will force dirt into the fibres Foam element clean in warm soapy water rinse and allow to dry thoroughly Dip the element in clean engine oil and squeeze out all the ex...

Страница 17: ...er then tighten with a plug wrench an additional turn if a new plug to compress the sealing washer If you are reusing a plug tighten 1 8 1 4 turn after the plug seats Fuel line To service the fuel lin...

Страница 18: ...mber 7 digits The code of the part The exact denomination The number of parts required The delivery address Please indicate clearly the means of transportation required such as express or by air Witho...

Страница 19: ...Saint Gobain Abrasives KFT Banyaleg Utca 60B H 1225 BUDAPEST Tel 36 1 371 2250 Fax 36 1 371 2255 e mail nortonbp axelero hu Czech Republic Norton Diamantove Nastroje Sro Vinohrdadska 184 CS 13000 PRA...

Страница 20: ...20 SAINT GOBAIN ABRASIVES 190 Bd J F Kennedy L 4930 BASCHARAGE LUXEMBOURG Tel 352 50401 1 Fax 352 501633 e mail sales nlx saint gobain com www construction norton eu 10 12 2008...

Отзывы: