![NorthStar 4065 Скачать руководство пользователя страница 3](http://html.mh-extra.com/html/northstar/4065/4065_installation-operation-and-maintenance-manual_1708831003.webp)
3
Unpacking
Closely inspect all contents in the shipping carton.
-If you have missing or damaged components then: Contact Product Support at 1-800-270-0810.
Due to the weight of the trencher, two people are needed to unpack. The following procedure prepares the trencher for
towing.
1.)
After removing the packaging material that secures the trencher to the shipping pallet, add gas and oil to the engine.
Fill engine crankcase with 10W-30 motor oil and fill gas tank fresh gasoline. Start the engine and set at half-throttle.
2.)
Lift the boom up by pulling lever #3.
1
2
4
3
fig01381
3.)
There are two travel pins in the base of the boom that will snap with any movement other that straight up. Remove
the up-down and side-to-side travel pins from the base of the boom assembly. Keep these two pins to re-insert for
towing.
up-down
travel pin
side-to-side
travel pin
fig01382
4.)
Lower the boom to the ground by pushing lever #3 and continue to lower the boom until it raises the boom end of the
trencher off the ground 4-5 inches.
5.)
Insert the wheels in the front (boom end) of the frame. This is the proper position of the wheels for towing. Secure
the wheels to the frame with the pins and pin clips provided.
fig01383
Содержание 4065
Страница 5: ...5 Assembly Instructions 1 Attach bucket to boom with 1 x 8 pins Secure 1 x 8 pins with cotter pins ...
Страница 13: ...13 Parts Explosion 4065 Rev S 1 ...
Страница 16: ...16 Manufactured by Northern Tool Equipment Co 2800 SouthCross Drive West P O Box 1499 Burnsville MN 55337 0499 ...