![NorthStar 11953 Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/northstar/11953/11953_operators-manual_1708830014.webp)
Assembly
14
2.) Splitter Control Valve
a.) Disconnect return line hose.
b.) Remove elbow from splitter control valve (save elbow for later).
c.) Remove conversion plug from splitter control valve. (save conversion plug for later)
d.) Install tee into splitter cont
rol valve. Tighten with wrench. Point tee at 5 o’clock.
e.) Install power beyond plug, pipe reducer, and hose with elbow into splitter control valve. Tighten
with wrench. Point hose with elbow down.
f.) Install elbow (saved from step b above) into tee (installed in step d above). Tighten with
wrench. Point elbow at 3 o’clock. Keep tee pointed at 5 o’clock.
g.) Reconnect return line hose to elbow. Tighten with wrench.
h.) Install pipe reducer and hose with straight fittings into tee. Tighten with wrench.
Содержание 11953
Страница 2: ...Hazard Signal Word Definitions 2 ...
Страница 10: ...Machine Component Identification 10 ...
Страница 11: ...Machine Component Identification 11 ...
Страница 12: ...Machine Component Identification 12 ...
Страница 26: ...26 This page has intentionally been left blank ...
Страница 28: ...28 Manufactured by Northern Tool Equipment Co 2800 SouthCross Drive West P O Box 1499 Burnsville MN 55337 0499 ...