Assembly Instructions
33
Step 1
Install Leg to Tow Leg Weldment using
5/16 x 2-3/4 Bolt and 5/16 Nyloc nut.
Install Catch Pin through Hole in Tow Leg
as shown.
Step 2
Install the High Pressure Fittings to the
Beam Assembly. Thread the fittings into the
cylinder. Orient the Fittings as shown.
Install the Tow Leg Assembly to the Beam
Assembly. Use 3/8” x 1” Bolts and 3/8”
Class G Nuts. Using a Torque Wrench,
tighten to 37lb-ft.
Step 3
Attach the Beam Assembly and the Hose
Guide to the Hydraulic Tank Assembly.
Use 3/8” x 1-1/4” Bolts, and 3/8” Class G
Nuts. Using a Torque Wrench, tighten to
37lb-ft.
Install Grommets into the Hose Guide.
Beam assembly
Grommets
3/8” X 1-1/4” bolts
Tank assembly
Hose guide
3/8” class G
nuts
5/16” nut
Tow leg weldment
Catch pin
Leg
5/16” x 2-¾” bolt
High-pressure
fittings
Beam assembly
Tow leg assembly
3/8”
class G
nut
3/8” x 1” bolt
Содержание M11571GNEA
Страница 2: ...Hazard Signal Word Definitions 2...
Страница 24: ...Parts Breakdown Exploded View Rev A 24...
Страница 32: ...Assembly Instructions 32...
Страница 39: ...39 This page has intentionally been left blank...