Page 11 of 19
Air System Layout
○
1 Air grease gun
○
2
Air Hose 3/8” (I.D.)
○
3 Oiler
○
4 Pressure Regulator
○
5 Filter
○
6 Shut Off Valve
○
7 Whip Hose
○
8 Coupler Body and Connector
○
9 Drain Daily
○
10
1/2” or Larger Pipe and Fitting
○
11 Air Dryer
○
12
1” or Larger Pipe and Fitting
○
13 Air Compressor
○
14 Auto Drain
○
15 Drain Daily
Cartridge Loading
•
Remove the tube container (#19) from the gun body. See Figure 8.
Figure 8
•
Pull back on the tube handle (#22) until it is fully extended. Lock it into place with the locking plate
(#23). See Figure 9.
Figure 9