![Northern Telecom Meridian SL-1 Скачать руководство пользователя страница 69](http://html1.mh-extra.com/html/northern-telecom/meridian-sl-1/meridian-sl-1_installation-and-testing-instructions_1708625069.webp)
3 - 6 4 I n s t a l l a t i o n
2-Mb/s Remote Peripheral Equipment Appendix 1 to 553-2741-200
C h a r t 3 - 1 0
QBL15 battery distribution box installation
The QBL15 battery box should be located on the wall near the Meridian
SL-1 cabinet to readily enable viewing of meters and LED indicators on the
front of the unit.
S t e p P r o c e d u r e
1 Unpack the QBL15 battery distribution box and dispose of the
packing material.
CAUTION
The QBL15 battery distribution box weights approximately 50
lbs (23 kg).
2 Inspect the unit for damage, paying particular attention to the
meters. Report any damage to supplier.
3 Using screws or bolts, mount the unit on the wall within 6 ft
(1830 mm) of the batteries. The bottom of the unit should be
approximately 4 ft (1220 mm) above the floor.
Note:
A wooden backboard may be required to support the
unit on the wall.
4 Remove the screws securing the front panel of the battery
distribution box.
5 Remove the main fuse (CRS200) from the QBL15 battery
distribution box (Figure 2-13).