
Chapter 37 Hardware procedures 207
Passport 7400 Hardware Installation, Maintenance, and Upgrade 5.2S1
Installing a 3-slot Passport switch in a rack or cabinet
Install a 3-slot Passport switch in a rack or cabinet as an alternative to
mounting the switch on the floor or desktop.
Prerequisites
•
If your 3-slot Passport switch requires seismic protection, see “Installing
a 3-slot Passport switch in a seismic rack or cabinet” (page 210)
•
You will need a rack-mount kit with PEC NTHQ04AA.
•
The rack or cabinet must already be anchored and grounded. For more
information, see “Cabinet installation” (page 81).
•
If you plan to install a 3-slot Passport switch in a cabinet, check the
position and alignment of the vertical rails. Set the front rails 11.4cm (4.5
inches) from the front of the cabinet. Set the front and rear vertical rails
36.8 (14.5 inches) apart.
•
Install 13” termination panels prior to installing a 3-slot Passport switch
in a rack or cabinet.
Procedure steps
1
Attache the rack mount brackets to each side of the chassis using a
screwdriver. Attach the cable management bracket to the fan-less side of
the chassis. See the figure “Securing the rack-mounting brackets to the 3-
slot Passport switch” (page 208)
2
Position the chassis in the rack or cabinet.
3
Fasten the front brackets to the rack’s front rails using the four screws
provided. See the figure“Securing the rack-mounting brackets to the front
vertical rails” (page 209)
CAUTION
Risk of equipment damage
You need two people to install a 3-slot Passport switch
in a rack or cabinet: one person must hold the chassis in
place while a second person fastens the screws.
Содержание Passport 7400
Страница 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 7401 240 5 2S1 ...
Страница 28: ...28 About this document 241 7401 240 5 2S1 ...
Страница 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Страница 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Страница 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Страница 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Страница 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Страница 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Страница 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Страница 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Страница 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Страница 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Страница 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Страница 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Страница 200: ...200 Chapter 37 Hardware procedures 241 7401 240 5 2S1 Figure 61 Installing a rear cover on a 5 slot Passport switch ...
Страница 228: ...228 Chapter 37 Hardware procedures 241 7401 240 5 2S1 Figure 77 16 slot Passport switch shelf assembly PPT 0892 001 AA ...
Страница 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Страница 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Страница 437: ......