Failed function processor replacement
Replace a failed function processor (FP) to either restore or ensure continued
delivery of configured services.
•
“Prerequisites to failed function processor replacement” (page 119)
•
“Failed function processor replacement task flow” (page 120)
Prerequisites to failed function processor replacement
•
In order to replace an FP, a software operator and hardware installer must
coordinate their activities. Failure to do so can result in service
interruptions. Whenever possible, schedule upgrades and replacements
of spared FPs during maintenance windows.
CAUTION
Risk of electrostatic damage
When handling processor cards, wear a grounded
antistatic wrist strap so that you do not damage electronic
parts. For more information, see “Avoid damage from
static electricity” (page 174).
CAUTION
Service loss on active ports
Unspared FPs, including FPs configured with intra-card
APS (port-to-port sparing on a single FP), will
experience a loss of service on any active ports for the
time it takes to replace the FP.
Содержание Passport 7400
Страница 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 7401 240 5 2S1 ...
Страница 28: ...28 About this document 241 7401 240 5 2S1 ...
Страница 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Страница 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Страница 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Страница 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Страница 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Страница 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Страница 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Страница 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Страница 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Страница 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Страница 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Страница 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Страница 200: ...200 Chapter 37 Hardware procedures 241 7401 240 5 2S1 Figure 61 Installing a rear cover on a 5 slot Passport switch ...
Страница 228: ...228 Chapter 37 Hardware procedures 241 7401 240 5 2S1 Figure 77 16 slot Passport switch shelf assembly PPT 0892 001 AA ...
Страница 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Страница 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Страница 437: ......