Page 154 of 378
Install and configure ITG ISL Trunk node
553-3001-202
Standard 1.00
April 2000
Installation Procedure Summary
Table 26 lists the procedures to install and configure an ITG Trunk node. You
must complete all installation and configuration tasks before you transmit the
configuration data to the ITG Trunk cards.
Table 26
Installation procedures (Part 1 of 2)
Step
Procedure
Page
1
Create the ITG Trunk Installation Summary Sheet
2
Install and cable ITG trunk cards
3
Configure ITG Trunk data on the Meridian 1
Configure the ISL D-channel on the Meridian 1 for the DCHIP card
Configure ISDN feature in customer data block
Configure ITG ISL trunk cards and units
Configure dialing plans within the corporate network
4
Configure ITG Trunk data on MAT
Add an ITG Trunk node on MAT manually
Add a node and configure general node properties
Single vs. separate subnets for T-LAN and E-LAN
Configure DSP profiles for the ITG Trunk node
Configure SNMP Traps/Routing and IPs tab
Set Security for MAT SNMP access
Exit node property configuration session
Create the ITG Trunk node dialing plan using MAT
Содержание ISDN Signaling Link
Страница 2: ......
Страница 4: ...Page 4 of 378 553 3001 202 Standard 1 00 April 2000...
Страница 16: ...Page 16 of 378 Contents 553 3001 202 Standard 1 00 April 2000...
Страница 18: ...Page 18 of 378 About this guide 553 3001 202 Standard 1 00 April 2000...
Страница 264: ...Page 264 of 378 OA M using MAT applications 553 3001 202 Standard 1 00 April 2000 Figure 54 Retrieve ITG node window...
Страница 294: ...Page 294 of 378 OA M using the ITG shell CLI and overlays 553 3001 202 Standard 1 00 April 2000...
Страница 378: ...Page 378 of 378 Index 553 3001 202 Standard 1 00 April 2000...
Страница 379: ......