background image

2

Содержание C6B-T

Страница 1: ...nd or furnace air h a n d l e r m a r k i n g s before proceeding with installation of the coil These instructions are primarily intended to assist qualified individuals experienced in the proper inst...

Страница 2: ...2...

Страница 3: ...Furnace Air Handler 4 Downflow Horizontal 4 3 Pressure Verification 4 4 Refrigerant Line Connections 5 5 Completing the Installation 5 Condensate Drain 5 Air Filters 5 Close off Plates and Panels 5 Re...

Страница 4: ...when an add on coil is installed Refer to Coil Specifications for recommended CFM and allow for pressure drop across the coil and filters 2 COIL INSTALLATION Upflow Furnace WARNING Electricfurnacesma...

Страница 5: ...the sensing bulb and the lineset braze joint before applying any heat 12 Braze the individual connections with dry nitrogenflowingthroughthejointtoeliminate internal oxidation and scaling 13 Fasten nu...

Страница 6: ...ical power to the furnace and outdoor condensing unit is off before performing any maintenance or service on the system To ensure optimum system performance and to minimize the possibility of equipmen...

Страница 7: ...17 1 2 17 1 2 17 1 2 17 1 2 17 1 2 23 1 2 23 1 2 23 1 2 23 1 2 27 27 27 27 27 HS Height of Suction Line in 15 1 2 15 1 2 15 1 2 15 1 2 15 1 2 15 1 2 21 1 2 21 1 2 21 1 2 21 1 2 25 25 25 25 25 Connect...

Страница 8: ...Condensation Deflector 690071 Insulation Case Nut 606287 Distributor Figure 3 Condensation Deflector Positioning 708821D Replaces 708821C Specifications illustrations subject to change without notice...

Отзывы: