background image

Page 1

INSTALLATION INSTRUCTIONS

Roof Curb Kit for R7TQ 072/090/120 Series

Curb sides are constructed of 16-gauge coated steel and 
wooden nailers. All hardware necessary to assemble the 
curb is provided; installation hardware must be field supplied. 
Vertical discharge roof curbs include dividers that allow for 
inserting ductwork down from the top. Curbs are  constructed 
of 16-gauge coated steel and 2 × 4 wooden nailers.

TABLE 1. CURB IDENTIFICATION

1011391

8”

203.2 mm

1011388

14”

355.6 mm

1011389

18”

457.2 mm

1011390

24”

609.6 mm

• 

Assembly and installation of the curb are the 
responsibility of the installer.

•  Before installation, verify that the curb ordered is the 

appropriate one for the unit. Refer to Tables 1, 2 and 3.

•  Depending on the weight and the roof structure, tread 

material may be required under the rails. Curb and 
equipment must be level.

•  If installing more than one system, it is recommended to 

minimize structural span deflection to discourage sound 
transmission.

•  Mounting hardware and flashing must be field supplied. 

•  Check the roof curb for squareness. The curb must be 

adjusted so that the diagonal measurements are equal 

within a tolerance of ±1/8” (±3 mm).

•  Level the roof curb. To ensure a good weatherproof seal 

between the unit curb cap and the roof curb, the roof curb 

must be leveled in both directions with no twist end to 

end. Shim as required and secure curb to the roof deck 

before installing flashing.

•  Install field-supplied flashing. If ductwork is being installed 

from the top, slide the ductwork down into the discharge 

and return air openings. Ductwork should be sized slightly 

smaller with a minimum 3/4” duct flange that will rest on 

and be attached to all sides of the duct connection. See 

the system installation manual for ductwork requirements.

•  Apply 1/4” x 1-1/4” foam sealant tape to both the 

top surface of the curb rails and the top surface of 

the perimeter of the integral dividers, being sure to 

make good butt joints at all corners. The sealant 

tape must be applied to prevent water leakage into 

the curb area due to blown rain and capillary action. 

IMPORTANT:

 Verify that the unit will be placed in the correct 

airflow orientation to mate properly with the discharge and 

return air openings.

TABLE 2. CURB PART NUMBERS

HEIGHT

ITEM #

P/N 

DESCRIPTION

QTY

8”

1

1006197

END

2

2

1006198

CONTROL SIDE

1

3

1006199

FILTER ACCESS SIDE

1

14”

1

1006186

END

2

2

1006187

CONTROL SIDE

1

3

1006188

FILTER ACCESS SIDE

1

18”

1

1006191

END

2

2

1006192

CONTROL SIDE

1

3

1006193

FILTER ACCESS SIDE

1

24”

1

1006194

END

2

2

1006195

CONTROL SIDE

1

3

1006196

FILTER ACCESS SIDE

1

P/N

ITEM

DESCRIPTION

QUANTITY

See Curb 

Part Number 

Table

1

Curb End 

2

2

Curb Filter Access side

1

3

Curb Control side

1

TABLE 3. BILL OF MATERIALS

1006182

4

Support

1

1006185

5

RA Support

1

1006184

6

SA Support

1

600255

7

Screws S.M. 10AB x 1/2”

4

16247

8

5/16”-18 x 3/4” Hex Cap 

Screws

16

612001

9

Washers

32

1035

10

5/16”-18  Hex Nut

16

66302

11

Gasket 1/4” x 1 1/4”      

50 FT

Figure 1. Support and Gasket Locations

5

6

4

#7 Fastener
locations 

Bottom side view
of  supports

Refer to Table 3
for item numbers

Form R7TQ-072/090/120 (03-18) PN1012100A,

Отзывы: