background image

P

rin

te

d

 in

 C

an

a

d

a

2

5

7

3

0

6

8

-C

hum idity.com

USA

 835 Commerce Park Drive, Ogdensburg, New York 13669      

Canada

 2740 Fenton Road, Ottawa, Ontario K1T 3T7   

1.866.NORTEC1
[email protected]

All information contained in this quick start guide is 

for general information purposes only. This is NOT an 

installation manual and nothing in this guide is meant to 

constitute installation instructions. For complete Nortec 

installation/operation recommendations for your Nortec 

equipment, please refer to the installation manual for your 

specifi c system, accessories, and components.

All electrical connections must be installed in accordance 

with local and national electrical code requirements by a 

licensed electrician.

All water supply and drain line connections must be 

installed in accordance with local plumbing codes by a 

licensed plumber.

Nortec does not accept any liability for installations of 

humidity equipment installed by unqualifi ed personnel 

or the use of parts/components/equipment that are not 

authorized or approved by Nortec.

Get complete installation, operation, engineering manuals 

and more from our website: www.humidity.com

Member of the Condair  Group

Содержание RH2

Страница 1: ...Quick Start Installation Guide humidity com RH2 Mounting Plumbing Electrical Steam Distribution ...

Страница 2: ...2 then jumper J10 must be removed from the control board 2 If Air Proving Switch is wired to terminals 1 and 2 of the low voltage terminal strip for RH2 Duct jumper must be installed between terminals 1 and 8 supplied with equipment RH2 Installation Check ...

Страница 3: ... possible 3 Mount on a suitable wall or vertical surface Do not sit the on the floor where freezing can occur or on vibrating surfaces 4 Allow clearances for plumbing and electrical connections Consult local and national codes prior to final location and installation 5 Install only in areas with ambient temperature 41 104 F 5 40 C and relative humidity 5 95 non condensing 6 When possible mount the R...

Страница 4: ...ly voltage 2 Dedicated external fused disconnect must be installed Fusing must not exceed max circuit protection as indicated on the specification label 3 Ensure that adequate power is available to carry full humidifier amp draw as indicated on the specification label 4 Do not use neutral wire as a ground connect to ground lug 5 All Wiring to be in accordance with national and local electrical codes ...

Страница 5: ...Line Requirements 1 Use 7 8 Copper Do not use PVC 2 Install an air gap within three feet of the humidifier A copper reducer from 2 5 7 8 is ideal do not allow the drain hose to bottom out in the funnel cup 3 The drain line should not end in a sink used frequently by personnel or where plumbing codes prohibit it Route to a floor drain or equivalent for safety reasons 4 Insure drain line is adequately...

Страница 6: ...ylinder Voltage Steam Output lbs hr kg hr Material Maximum Steam Line Length ft m Possible Losses lbs hr kg hr Nortec Steam HoseNo MED L Copper Tube Stainless Steel Tube 110 120V 5 2 3 Part Number 1328810 7 8 3 4 0 875 X 0 049W 7 2 0 5 0 2 208V 8 7 3 3 10 3 1 0 5 220 240V 10 4 6 12 3 5 1 5 0 7 Oversized Steam Line used for longer steam runs 110 120V Not recommended Not Recommended 1 1 125 X 0 049W...

Страница 7: ... refer to the installation manual for your specific system accessories and components All electrical connections must be installed in accordance with local and national electrical code requirements by a licensed electrician All water supply and drain line connections must be installed in accordance with local plumbing codes by a licensed plumber Nortec does not accept any liability for installation...

Отзывы: