
10-10
Page 4
2008-02-18
3. ELECTRICAL
(1)
Humidifiers require field wiring to the primary voltage terminal block. Power and
fusing requirements are as indicated on the Specification label. Wiring is fed
through an electrical knockout in the bottom back of the electrical cabinet.
4. CLEARANCES
(1)
The clearance dimensions shown in the manual are for reference only and are the
minimum requirements for maintenance of the humidifier.
5. WATER REQUIREMENTS
(1)
The NHRS will operate properly on all potable water sources. De-mineralized
water supplies such as Reverse Osmosis and De-Ionized water will reduce
maintenance intervals significantly.
6. STEAM DISTRIBUTION AND ABSORPTION
(1)
The NHRS can be used with stainless steel distributors or SAM-e manifolds for
short absorption distance.
(2)
The distance between the humidifier and the steam distribution system should not
exceed 15 feet for accurate humidity control.
(3)
Refer to the Steam Distribution Engineering Manual (Form #XX-232) or the
H.E.L.P. software.
Содержание NHRS
Страница 1: ...Manual No H 104 2008 02 18 NHRS Series RESISTIVE ELEMENT STEAM HUMIDIFIER Engineering Manual TM ...
Страница 5: ...2008 02 18 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 6: ...10 00 Page 1 2008 02 18 10 00 INTRODUCTION ...
Страница 8: ...10 00 Page 3 2008 02 02 Figure 1 NHRS ...
Страница 9: ...10 00 Page 4 2008 02 18 THIS PAGE ITENTIONALLY LEFT BLANK ...
Страница 10: ...10 10 Page 1 2008 02 18 10 10 HUMIDITY STEAM ABSORPTION DISTRIBUTION ...
Страница 15: ...10 10 Page 6 2008 02 18 Figure 2 NHRS Physical Data 010 090 ...
Страница 16: ...10 10 Page 7 2008 02 18 Figure 3 NHRS Physical Data 135 180 ...
Страница 17: ...10 10 Page 8 2008 02 18 Figure 4 RMBP Physical Data Dimensions ...
Страница 18: ...10 20 Page 1 2008 02 18 10 20 SPECIFICATION ...