10-10
Page 11
2008-04-11
2. ZONES
A. INTRODUCTION
(1)
It may be necessary to break down the space to be humidified into zones.
Limitation of the control devices and maximum run of feed piping may indicate the
need for multiple zones. Refer to the Engineering manual for detailed limitation of
components. Up to four zones can be controlled from one control panel, additional
zones can be added with the use of a pilot air regulator acting as a volume booster
for the pilot signal. See Figure 2 Multiple Zone Layout.
B. SUPPLY FEED LINES
(1)
Main supply lines connecting to the system must be sized to handle system flow
volumes and pressures. Connections to each zone should have an isolation valve
installed by using a NORTEC supplied primary pressure control section as
illustrated in Figure 3 Water and Air Line Pressure Control. Primary air pressure
feed to each zone should not exceed 90 psig. Water feed pressure is not to
exceed 25 psig for AFE, Mini and Octo hardware. Supply water pressure is not to
exceed 65 psig for AFD systems.
(2)
Both water and air lines must be installed as per the mechanical drawings using
standard plumbing joining techniques. The spans must not be greater than 5 feet
without a supporting bracket. For long runs of piping, expansion joints may be
needed and these joints must meet local building codes. When using Nortec
supplied saddle clamps, the maximum line size for supplying to nozzles is 11/16”
O.D. If saddle clamps by others are used, please size fittings to match the pipe.
C. CLEANING
(1)
Manual valves must be installed at the ends of all lines to facilitate cleaning and
drainage of lines. Cleaning is done by temporarily connecting the pipes to a
compressed air source at one end of the pipe. The other end of the pipe must not
be connected to any equipment but be free to allow the egress of foreign matter.
Care must be taken to protect personnel, animals, machines or other sensitive
material from the potentially hazardous and contaminating matter, which will exit at
high speed from the opening.
NOTE
Cleaning of the lines of all foreign material prior to connecting any system
component is critical, failure to maintain clean lines may void the warranty.
D. MOUNTING OF NOZZLES
(1)
Each supplied NORTEC nozzle has a 3/8” NC 16 threaded port on the under side
of the nozzle which is used to fasten the nozzle to a mounting bracket, as
illustrated in Figure 4 Nozzle To Bracket Interface or Figure 5 AFE Nozzle Ceiling
Mounting. If other than NORTEC supplied mounting hardware is to be used,
ensure correct bolt and thread size is used. Nozzles can be mounted in any
elevation angle as water throughput capacity is not affected by this orientation.
However, AFE nozzle capacity is sensitive to vertical height differences to the
vacuum valve. The maximum nozzle installation height allowable above the water
supply line is 12” (30 cm).
Содержание Airfog Series
Страница 1: ...2008 04 11 1502247 C AIRFOG Series Atomizing Humidifier Installation Manual TM ...
Страница 7: ...2008 04 11 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 8: ...10 00 Page 1 2008 04 11 10 00 INTRODUCTION ...
Страница 13: ...10 00 Page 6 2008 04 11 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 14: ...10 10 Page 7 2008 04 11 10 10 INSTALLATION ...
Страница 16: ...10 10 Page 9 2008 04 11 Figure 1 Typical Nozzle Layout for Wall Mounted System ...
Страница 17: ...10 10 Page 10 2008 04 11 Figure 2 Multi Zone Layout ...
Страница 27: ...10 10 Page 20 2008 04 11 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 28: ...10 20 Page 21 2008 04 11 10 20 MINI OCTO INSTALLATION ...
Страница 30: ...10 20 Page 23 2008 04 11 Figure 1 Mini Installations Figure 2 Plumbing End Connections ...
Страница 34: ...10 20 Page 27 2008 04 11 Figure 5 Ceiling Mounting of Octo Figure 6 Octo Air and Water Interfaces ...
Страница 36: ...10 30 Page 29 2008 04 11 10 30 START UP PROCEDURE ...
Страница 40: ...10 30 Page 33 2008 04 11 Figure 1 Capacity Output vs Vacuum Valve Adjustment Figure 2 AFE Capacity Chart ...
Страница 41: ...10 30 Page 34 2008 04 11 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 42: ...10 40 Page 35 2008 04 11 10 40 SHUT DOWN PROCEDURE ...
Страница 44: ...10 50 Page 37 2008 04 11 10 50 MAINTENANCE ...
Страница 48: ...10 60 Page 41 2008 04 11 10 60 TROUBLESHOOTING ...
Страница 51: ...10 60 Page 44 2008 04 11 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 52: ...10 70 Page 45 2008 04 11 10 70 SPARE PARTS ...
Страница 54: ...10 70 Page 47 2008 04 11 Figure 1 Octo Exploded View ...
Страница 56: ...10 70 Page 49 2008 04 11 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 58: ...10 70 Page 51 2008 04 11 Figure 3 Vacuum Valve Exploded View ...
Страница 60: ...10 70 Page 53 2008 04 11 Figure 4 Control Panel Exploded View ...
Страница 62: ...10 70 Page 55 2008 04 11 THIS PAGE INTENTIONALLY LEFT BLANK ...