▲The illustration is an example. Please check with the actual water heater about the position of piping, and form.
•
•
•
•
•
•
•
Hanger
Intake
Horizontal Vent Termination- 3" (75mm) Concentric PVC/CPVC Termination
Exhaust
Straps
The concentric termination may be shortened,
but not lengthened from its original factory
supplied length.
The concentric termination may only be used
for horizontal terminations.
Terminate at least 12" (300mm) above grade or
above snow line.
Terminate at least 7' (2.1m) above a public walkway,
6' (1.8m) from the combustion air intake of any
appliance, and 3' (0.9m) from any other building
opening, gas utility meter, service regulator etc.
Terminate at least 3' (0.9m) above any forced air
inlet within 10' (3m), 1' (0.3m) below, 1' (0.3m)
horizontally from or 1' (0.3m) above any door,
window, or gravity air inlet into any building per
National Fuel Gas Code ANSI Z223.1/NFPA 54.
Slope the horizontal vent 1/4" upwards for every
12" (300mm).
Use a condensation drain if necessary.
In the Commonwealth of Massachusetts a carbon
monoxide detector is required for all side wall
horizontally vented gas fuel equipment.
Please refer to Technical Bulletin TB 010606 for full
installation instructions.
Slope vent
Upwards
1" (25mm) to
4" (100mm)
Insert Bird Screen ***
in End of Termination
•
There must be a 1" (25mm) to 4" (100mm) clearance
between the outside wall and the air intake section
of the termination as illustrated on the left.
•
3" (75mm) PVC or CPVC pipe may be used
with the concentric termination.
Maintain the same vent pipe diameter from the
water heater flue to the termination.
•
Install a securing strap to prevent movement of
the termination.
Strap
*** Not supplied with
water heater,
order separately.