
VP23 Analogue / IO-Link
TCF Fellbach (2021).012
03/21
Our policy is one of continued research and development. We therefore reserve the right
to amend, without notice, the specifications given in this document.
Caution!
Before mounting the valve, the pneumatic lines must be cleaned of mounting residues (e.g. by blowing them out).
Caution!
The valve may only be mounted through the three mounting holes of the valve mechanism:
Example VP23 analogue, NG8:
Example VP23 IO-Link, NG16:
7.3 Accessories
7.2. Installation
Detailed ordering information on available accessories can be found in the product data sheet or on our homepage:
https://www.norgren.com