Norfolk Greenhouses BCCPSW3820+G Скачать руководство пользователя страница 2

2

Canopy

Introduction

Thank you for your purchase of our Carport, we hope you enjoy.

Please read through these instructions and familiarise yourself with the construction 

process before you begin.

We operate a programme of continuous product improvement and we reserve the right 

to change the specification without prior notice, the latest model is supplied. 

Although we have taken great care to ensure this kit is complete, occasionally we make 

mistakes. There are no robots involved in the production our products, just regular 

people! Please check that you have all of the parts listed before starting the assembly. If 

there are any damaged or missing parts, please call us on 020 3011 2040. We will express 

any missing parts to you as soon as possible.

Keep these instructions in a safe place for future use. They can be useful for identifying 

parts when ordering replacements should you suffer severe storm damage or vandalism.

We are confident you will get a long life from your product. We offer a 1 year 

manufacturers warranty, against manufacturing faults or defects. Sadly we are unable 

to cover against storm or weather damage. If you experience any difficulties with your 

product please call the number above for support.

Contents

Hints, Tips & Safety

 

3

Parts List 

4

Frame Assembly

 

8

Roof Assembly

 

14

Gutter Assembly

 

18

Содержание BCCPSW3820+G

Страница 1: ...Assembly Instructions IMPORTANT Please read these instructions thoroughly before starting assembly Check all parts are present before assembly call 020 3011 2040 for replacement parts These instructio...

Страница 2: ...e all of the parts listed before starting the assembly If there are any damaged or missing parts please call us on 020 3011 2040 We will express any missing parts to you as soon as possible Keep these...

Страница 3: ...ssembly area Keep the area around your work place area clean and tidy Take care when handling sharp tools and never carry sharp tools in your pocket Never leave your product unattended or partially bu...

Страница 4: ...4 Canopy Parts List 3x LEG PST1 2 0m model PST3 2 5m model Framework 2x RL16 1x RL17 2x RL17A 2x RL19 1x RL20 3x BM1 1x GUT130W 1x GUT1575W 1x GUT2000W 2x DP85W 1x DP1580W DP2080W 3x XL71...

Страница 5: ...5 Contact Support on 020 3011 2040 Norfolk Greenhouses Roof Sheets SR6 1140mm x 1830mm 4x 4x SR7 1140mm x 940mm...

Страница 6: ...6 Canopy Parts List Hardware WROS1 WRUS1 WRES1 WRKS1 WKFB3 1x 3x 2x 1x 1x WKFB2 2x WOGC3 2x HBD 7x HBDT 4x HBP 2x NYLOC 70x STUD30 35x...

Страница 7: ...7 Contact Support on 020 3011 2040 Norfolk Greenhouses Hardware ST4X34 ST8X5 SC6X32 MM7X60 CP6 47x 30x 78x 6x 3x 1x 8 5mm Drill Bit CBM6X80 6x...

Страница 8: ...IN 2830 2330 OPTIMUM 2905 2405 MAX Unless otherwise stated all dimensions in mm i Offer both RL17A to the wall and measure from ground to underside of beam Align horizontally using a spirit level and...

Страница 9: ...9 Contact Support on 020 3011 2040 Norfolk Greenhouses Step 3 Add CP6 to the LEG then fix BM1 between the Leg and RL17A Step 4 Repeat previous step for second Leg then fix RL17 between both uprights...

Страница 10: ...10 Canopy Step 6 Attach 2x RL16 Step 5 Fix HBD and HBDT brackets to BM1 beams as configured below Frame Assembly...

Страница 11: ...act Support on 020 3011 2040 Norfolk Greenhouses Step 8 Fix RL20 between both uprights Step 7 Assemble LEG and BM1 as shown fix to RL17A For 3 8m Carport use RL20 For 3 8m Carport with Extension Kit u...

Страница 12: ...12 Canopy Step 10 Attach 2x RL19 Step9 Fix HBD brackets to BM1 as shown Frame Assembly...

Страница 13: ...rfolk Greenhouses Step 11 Fix XL71 to underside of each BM1 Push fit HBP to exposed ends of the front beam If building a Carport with Extension from this point on refer to Carport Extension manual sup...

Страница 14: ...he front left corner of the roof position so that there is a 50mm overhang from front beam see image right Apply fixings 1 to 4 into front beam RL17 every 3rd corrugation see image below Move the stru...

Страница 15: ...ix exposed edge of last SR6 sheet to BM1 Step 13 Fix remaining 3x SR6 sheets i Overlay remaining SR6 sheets by 3 corrugations then fix with 8x SC6X32 every 3rd corrugation as shown i Fix using 4x SC6X...

Страница 16: ...SR7 sheets Step 15 Position SR7 on top of first SR6 tight against the wall and fix Roof Assembly i Fix using 9x SC6X32 on exposed edge and every 3rd corrugation as shown i Fix each sheet using 8x SC6...

Страница 17: ...17 Contact Support on 020 3011 2040 Norfolk Greenhouses Step 17 Fix exposed edge of last SR7 sheet to BM1 i Fix using 3x SC6X32 as shown...

Страница 18: ...18 Canopy Step 18 Assemble gutter and fix to front beam of carport Gutter Assembly...

Страница 19: ...Norfolk Greenhouses Step 20 Anchor feet to the ground Step 19 Assemble and fix downpipe to LEG i Use spirit level to align legs in the upright position Fix to the ground through holes in steel foot us...

Страница 20: ...Canopy Norfolk Greenhouses 1 Vincent Avenue Crownhill Industry Milton Keynes MK8 0AB Tel 020 3011 2040 E mail info norfolk greenhouses co uk...

Отзывы: