Nordson iDry
r
Series Induction Dryers
11
Part 1075452
−
04
E
2016 Nordson Corporation
105 mm (4.13 in.)
to 175 mm (6.89 in.)
End Sizes
100 mm (3.94 in.)
End Sizes
Up to 83 mm (3.26 in.)
End Sizes
1/4
−
20 NCB
Threaded Insert
(6) holes eq. sp.
on 9.00 B.C.
1/4
−
20 NCB
Threaded Insert
(6) holes eq. sp.
on 6.50 B.C.
1/4
−
20 NCB
Threaded Insert
(6) holes eq. sp.
on 5.50 B.C.
60
_
60
_
60
_
Figure 7
Entrance and Exit Hub Mounting Hole Pattern
Coil and Tube Installation
See Figure 8. Install the coil and glass coil tube as follows:
1. Disconnect and lockout power to the dryer.
2. Use a
5
/
16
in. hex wrench to unlock the locks at each end of the coil tray
lid. Lift the lid to the full up position.
3. Remove the screws (1) securing the air heater and exhaust vent to the
entrance and exit hubs. Move the air heater and exhaust vent away
from the hubs.
4. Remove the coil tube hold-down screws and cushions (2) from the
entrance and exit hubs.
5. Unpack the coil (4) and glass coil tube (3). Carefully insert the tube
through the coil.
6. Carefully install the coil and tube assembly in the coil tray, positioning
the ends of the tube into the hubs. Unless the coil is marked with the
flow direction, it does not matter which end of the coil is at the entrance
or exit.
7. Re-install the coil tube cushions and hold-down screws (2) on the exit
and entrance hubs.
8. Re-install the heater blower and exhaust vents on the entrance and exit
hubs with the screws (1).