4-20
Power-Up
and
Testing
To check Board Sensor operation:
"
NOTE
This procedure assumes the following:
•
Each conveyor station has a board sensor that is positioned to sense
the workpiece.
•
The conveyor rail width has been adjusted to fit a production sample workpiece.
Perform this procedure as applicable to the configuration of your dispensing system.
1.
Open the dispensing system hood.
2.
Place a production sample workpiece on the conveyor to the left of the dispense station board
sensor.
3.
In the Conveyor I/O Diagnostic dialog box (Figure 4-14), locate the board sensor inputs.
Figure 4-14 Conveyor I/O (Inputs 0-31)
4.
Manually move the workpiece under or over (depending upon system configuration) the
dispense station board sensor and monitor the dialog box
SENSOR_CTRA
input.
!
The
SENSOR_CTRA
input should change from
OFF
(
0
) to
ON
(
1
).
5.
Move the workpiece out of Board Sensor sensing range and monitor the dialog box
SENSOR_CTRA
input.
!
The
SENSOR_CTRA
input should change from
ON
(
1
) to
OFF
(
0
).
6.
Repeat Steps 4 and 5 for the pre-dispense station and post-dispense station, as applicable.
Содержание Asymtek Spectrum S-920
Страница 1: ...Spectrum Series S 920 Dispensing System Installation Operations Maintenance Manual P N 7212417 Rev A...
Страница 2: ......
Страница 4: ......
Страница 30: ...1 14 Introduction 1 10 5 Rear View Figure 1 7A Rear View 2 3 4 1 5...
Страница 124: ......
Страница 172: ...7 12 Maintenance Figure 7 7 Lubricating the X Axis Linear Guides Figure 7 8 Lubricating Y Axis Linear Guides...
Страница 185: ...Troubleshooting 8 11 Figure 8 3 FmXP Scale Setup Menu Figure 8 4 Scale Error Message...
Страница 190: ......
Страница 204: ......
Страница 208: ......
Страница 210: ......
Страница 220: ......
Страница 222: ......
Страница 223: ......
Страница 224: ......
Страница 225: ......
Страница 226: ......
Страница 234: ......