Operation
6-35
7.
In the Production Window, click on
Load
.
!
The Open Window (Figure 6-32) opens.
8.
Select the program you wish to run and click on
Open
.
!
The current program name will appear in the Production Window.
Figure 6-32 FmXP Open Window
9.
In the Production Window, click on
Run
and then click on the
Run Production
button.
!
The Run Window opens (Figure 6-33).
10.
Load the workpiece.
11.
Click on
Go
to start the dispensing process.
Figure 6-33 Run Window
Содержание Asymtek Spectrum S-920
Страница 1: ...Spectrum Series S 920 Dispensing System Installation Operations Maintenance Manual P N 7212417 Rev A...
Страница 2: ......
Страница 4: ......
Страница 30: ...1 14 Introduction 1 10 5 Rear View Figure 1 7A Rear View 2 3 4 1 5...
Страница 124: ......
Страница 172: ...7 12 Maintenance Figure 7 7 Lubricating the X Axis Linear Guides Figure 7 8 Lubricating Y Axis Linear Guides...
Страница 185: ...Troubleshooting 8 11 Figure 8 3 FmXP Scale Setup Menu Figure 8 4 Scale Error Message...
Страница 190: ......
Страница 204: ......
Страница 208: ......
Страница 210: ......
Страница 220: ......
Страница 222: ......
Страница 223: ......
Страница 224: ......
Страница 225: ......
Страница 226: ......
Страница 234: ......