![Nordmann Engineering SPA Display Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/nordmann-engineering/spa-display/spa-display_installation-and-operation-manual_1703699012.webp)
12
3. Insert the in-wall mounted housing into the wall opening, align it with the help of a spirit level, then fix
it with the four fastening claws attached to the in-wall mounted housing (only necessary with cavity
walls).
Note: in massive walls the in-wall mounted housing must be fixed either with the screws and dowels
supplied or by using PU mounting adhesive or mortar.
Fig. 7: Mounting the in-wall mounted housing to the wall opening
4. Free the shielding of the CAN BUS cable(s) by removing the insulation from the appropriate clamp-
ing position to the end of the cable. Remove the exposed shielding to about 2 cm, then fix the end
of the remaining shielding with a piece of shrink tubing as shown in
and secure the exposed
shielding with the shielding clamp(s) to the housing.
Stripped-down shielding
shrinkable tubing
Cable wires
Fig. 8: Fix the CAN BUS cable(s) with exposed shielding to the housing with the shielding clamp(s)
Содержание SPA Display
Страница 1: ...INSTALLATION AND OPERATION MANUAL Nordmann SPA Display 2591871 A EN 1903...
Страница 32: ...Notes...
Страница 33: ...Notes...
Страница 34: ...Notes...
Страница 35: ......