6
1. While another person lifts the Base (1), attach the
Front Stabiliser (6) to the Base with two M10 x 80mm
Carriage Bolts (82) and two M10 Nylon Locknuts (81).
2. Remove the indicated screw and bracket from the
Base (1). Discard the screw and the bracket.
Next, turn the Base Foot (26) into the Base (1) as far
as possible.
3. Attach the Rear Stabiliser (7) to the Frame (2) with two
M10 x 127mm Button Screws (83).
Next,
hold the handle on the Frame (2) firmly with
both hands, pull and hold the Latch Lever (68),
lower the Frame slowly until the Rear Stabiliser (7)
is resting on the floor, and then release the Latch
Lever.
4. Hold a Hub Cover (75) and a Crank Arm (36) against
the left Crank Hub (38). Align the holes in the Hub
Cover and the Crank Arm with the unused holes in the
left Crank Hub. Next, insert four Hub Screws (87) into
the Hub Cover and the Crank Arm, and finger tighten
the Hub Screws into the left Crank Hub. Tighten one of
the Hub Screws, and then tighten the Hub Screw far-
thest from the first Hub Screw. Then, tighten the
remaining two Hub Screws.
Repeat this step on the other side of the elliptical exer-
ciser.
Make sure that the Crank Arms (36) are
attached so that one Crank Bushing Sleeve (43) is
at the top of the Side Shields (28, 29) when the
other Crank Bushing Sleeve is at the bottom of the
Side Shields.
6
81
81
82
1
1
Bracket
26
Screw
3
83
7
Handle
2
68
2
4
36
38
75
87
87
36
28
29
43
1
43