4 Commissioning
B 5000 en-2621
31
4.5 Checklist
Checklist
Subject
of check
Date
of check:
Information
see Section
Is the vent screw activated or the pressure vent screwed in?
Does the required orientation comply with the actual installation
position?
Are rotating parts covered with a contact guard?
Is the rotary encoder aligned?
Is the insulation resistance sufficiently high?
Checked the electrical connection?
Checked earthing?
Compared the parameterisation of the inverter with the name
plate?
Table 13: Checklist
Содержание PMSM
Страница 1: ...B 5000 en Synchronous motors PMSM Manual with installation instructions...
Страница 5: ...Publisher B 5000 en 2621 5...
Страница 37: ...7 Appendix B 5000 en 2621 37...
Страница 39: ...Key word index B 5000 en 2621 39...
Страница 40: ...6055002 2621...