WWW.NORAC.CA
PRECISION
DEFINED
Page
10
Visit
www.solutions.norac.ca
for
more
system
installation
and
troubleshooting
info.
5.3.
Hydraulic
Plumbing
From
this
point
on
in
the
installation
the
booms
will
be
inoperative
until
the
hydraulics
are
fully
installed.
1.
After
the
NORAC
valve
is
mounted,
the
hydraulic
hoses
and
fittings
can
be
plumbed.
The
plumbing
for
the
hydraulic
circuit
is
shown
schematically
in
Figure
2
.
2.
Install
the
8FORX
‐
8MOR45
(F04)
fitting
onto
fitting
F03
on
the
“T”
port
of
the
NORAC
block.
3.
Disconnect
the
tank
line
at
the
Rogator
valve
block
and
insert
the
8FORXR
‐
8MORT
tee
(F05).
4.
Connect
the
45
degree
end
of
hose
H02
to
the
tee
(F05)
and
route
to
the
NORAC
valve
block.
Connect
the
straight
end
of
hose
H02
to
F04
on
the
“T”
port.
5.
Disconnect
the
pressure
line
at
the
Rogator
valve
block
and
insert
the
6FORXR
‐
6MORT
tee
(F02).
6.
Connect
the
45
degree
end
of
hose
H01
to
the
tee
and
route
to
the
NORAC
valve
block.
Connect
the
straight
end
of
hose
H01
to
F01
on
the
“P”
port.
Figure
6:
Pressure
and
Tank
Plumbing
at
NORAC
Valve
Block
Figure
7:
Pressure
and
Tank
Plumbing
at
Rogator
Valve
Block
F03
F01
F04
H02
F05
F02
H01
H02
H01
Содержание Rogator 700 Series
Страница 1: ...Rogator 700 Series UC7 Boom Height Control System Installation Manual ...
Страница 31: ......