![Nokia NEM-4 Series Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/nokia/nem-4-series/nem-4-series_disassembly-instructions-manual_1699286007.webp)
CCS Technical Documentation
5 - Disassembly Instructions
Company Confidential
NEM-4
Issue 1 09/2003
Copyright
2003 Nokia Corporation.
Page 5-7
Company Confidential
NEM-4 Dome Sheet Exchange
Put the PWB Module into the Soldering Jig.
Use the SRT-6 to remove the faulty Dome Sheet. Place it
under the Dome Sheet as shown in the picture and lift it
up carefully from PWB Module.
Take care about components on the PWB Module during
removal of the Dome Sheet.
Use the same procedure also for the Dome Sheet Left.
Clean the pads on the PWB Module with a clean cloth if
necessary. Be carefully not damage the components on
the PWB.
Put the new Dome Sheet onto the Dome Sheet
Assembly Jig. Mind the guiding pins.